Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-01771
StatusFinaled
Name THE BOISE HOTEL & CONFERENCE CENTER
Site Address 3300 S VISTA AVE
Project NameBOISE HOTEL & CONFERENCE CENTE
Customer Number 
ePlanReviewNo
Description
**(BOISE HOTEL & CONFERENCE CENTER)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 76,632 sq ft existing hotel. This space was previously occupied by "Holiday Inn". NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/15/20128/16/20128/16/2012PPASS
DetailsJim Storey
Allen=Please call prior to inspection Phone #: ###-####
BLD-Final7/27/20127/30/20127/30/2012PPART
DetailsJim Storey
Allen Phone #: ###-#### need smoke seals on doors/ replace door out bldg with out glazing to meet 20 min.
FIRE-Final Inspection7/25/20127/26/20127/27/2012APASS
DetailsForrest France
Correction items verified for completion. Fire life safety passed.
FIRE-Final Inspection7/24/20127/24/20127/25/2012PNR
DetailsForrest France
Pending corrections.
FIRE-Final Inspection7/20/20127/23/20127/23/2012AFAIL
DetailsForrest France
Noted correction items include; post door to remain unlocked signage at the west main entry/exit doors and remove keyed locking hardware at the first set of vestibule doors, provide approved lever set at the kitchen exit door, relocate fire extinguisher at the second level executive offices to a normal path of travel, post signage at the pool gates, remove keyed lock at the excersise room, post building address numbers as discussed, repair EM lights at four locations. See also list of general requirements attatched to the permit documents for plan review conditions.
BLD-Final7/20/20127/23/20127/23/2012PDEFR
DetailsJim Storey
Lily Phone #: ###-#### fire c/n listforest call andsaid that they would recall upon completition