Description |
(JUMP TIME BOISE) (10-9-12 PLAN MODIFICATION TO CHANGE THE DESIGN OF THE EXTERIOR RAMP AND TO DELETE THE EXTERIOR STAIRWAY FROM THE DESIGN.) The fire sprinkler system is used for building area increase. To convert an existing 11,555 square foot warehouse to a trampoline gym, play area, and party facility. Work is to include a restroom accessible to the disabled, upgrading 2 existing restrooms to be accessible to the disabled, interior nonbearing walls, millwork, an exterior double leaf door, a new exterior concrete stairway and ramp, and finishes. A 1,200 square foot mezzanine will be constructed. Mezzanine work includes concrete footings, steel columns, wood bearing walls, wood beams, wood floor joists, wood floor sheathing, an open stairway, and guards. Special inspection is required for concrete, anchors in concrete, welding, and epoxy anchors. Elevated walkways and stairways will be provided to access the trampolines. Elevated walkway work includes steel columns, steel joists, wood decking, and guards. The design for the elevated walkway is a deferred submittal item. Storage is not allowed below the elevated walkways. Skirting is required at the perimeter of the walkways to prevent access to the area below the walkways by the public. At least one transfer system accessible to the disabled is required for each elevated walkway to provide access to the trampolines for the disabled. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
|