Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD12-01826
StatusFinaled
Name INTERIOR SYSTEMS INC
Site Address 7009 W FRANKLIN RD
Project NameBISHOP KELLY HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BISHOP KELLY HIGH SCHOOL – Classroom Remodel) To remodel a 1,210 square foot classroom by constructing a wall to make two separate classrooms. One classroom will be 696 square feet and one will be 514 square feet. Work is to include: construct one interior non-bearing wall, modify existing switching for independent controls requirement, modify fire alarms and sprinkler heads if necessary, and interior finishes. NOTE: This building is fire sprinklered for area increase. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20144/25/20144/25/2014PPASS
DetailsTom Arcoraci
Chad Phone #: ###-####
DOC - Permit Finaled4/25/20144/25/20144/25/2014PPASS
DetailsTom Arcoraci
FIRE-Final Inspection4/24/20144/25/20144/25/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in7/27/20127/27/20127/27/2012PPASS
DetailsTom Arcoraci
OR ###-#### Chad or Bobby Phone #: ###-####