BLD-Final | 2/22/2013 | 2/25/2013 | 2/25/2013 | A | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Zoning Perms.
|
FIRE-Final Inspection | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Jim Sly
|
|
|
pat Phone #: ###-#### Fire life safety....OK
|
BLD-Other | 1/9/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Jim Sly
|
|
|
Sheet rock inspection-Pat Phone #: ###-#### 1st layer and metal channel....ok.
|
BLD-Energy code compliance | 1/8/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Jim Sly
|
|
|
Pat phone
|
BLD-Energy code compliance | 1/8/2013 | 1/8/2013 | 1/8/2013 | P | PART |
Jim Sly
|
|
|
pat Phone #: ###-#### Need to come back to look at sheetrock boxes at HVAC exhaust fans.
|
FIRE-Conference | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover.
|
BLD-Framing/Rough-in | 1/4/2013 | 1/7/2013 | 1/7/2013 | A | PART |
Jim Sly
|
|
|
pat Phone #: ###-#### Framing OK ...need Fire Sprinkler rough- in and install sheetrock boxes around ceiling exhaust fans.
|
BLD-Wall Bracing | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 10/22/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Footing | 10/19/2012 | 10/22/2012 | 10/22/2012 | A | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### Partial...excavation, forms and rebar for footing....OK Placement 11' from East line in leiu of 10' as shown on plan. Talked to Contr. Need approval From Planners for change prior to pour.
|