BLD-Final | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Mike Jordan
|
|
|
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
|
FIRE-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference with Brad Turk to go over the remaining life safety items prior to a final sign off on this permit. Looks like we just need fire alarm as-builts and an RFI for deletion of the exits out of the north side of the emergency rooms.
|
BLD-Final | 6/30/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Mike Jordan
|
|
|
Jim Martin Phone #: ###-#### Inspection requested via web by Brad Turk. Phase 3 ok to occupy.
|
FIRE-Final Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Troy Cobbley
|
|
|
Phase III (Med. Room/Lab) Life safety passed.
|
FIRE-Final Inspection | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | CANC |
Troy Cobbley
|
|
|
Not ready for life safety
|
BLD-Ceiling Grid Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
emerg phase 3 ok
|
BLD-Final | 6/19/2014 | 6/23/2014 | 6/23/2014 | A | CANC |
Tom Arcoraci
|
|
|
Jim Martin. After 10:00am would be great. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
FIRE-Final Inspection | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety passed in the temporary corridor and trauma area of the remodeled ER.
|
BLD-Final | 5/12/2014 | 5/12/2014 | 5/12/2014 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk trauma area wip ok
|
BLD-Conference | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
|
FIRE-Conference | 4/8/2014 | 4/8/2014 | 4/9/2014 | P | DONE |
Troy Cobbley
|
|
|
Spoke about fire/smoke dampers and door hardware.
|
FIRE-Conference | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | DONE |
Troy Cobbley
|
|
|
brad turk and I discussed existing
|
BLD-Framing/Rough-in | 3/13/2014 | 3/17/2014 | 3/17/2014 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for temp corridor
|
FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 | P | PART |
Forrest France
|
|
|
Fire life safety at the temporary storage room and soiled holding room passed inspection.
|
BLD-Final | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Tom Arcoraci
|
|
|
Final for Temp Soiled/ Storage. Jim MArtin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
FIRE-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 | A | PART |
Troy Cobbley
|
|
|
Life safety in 2B and Staff Lounge passed.
|
BLD-Final | 12/26/2013 | 12/27/2013 | 12/27/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk 2b and staff room ok
|
BLD-Ceiling Grid Inspection | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | DONE |
Tom Arcoraci
|
|
|
|
BLD-Ceiling Grid Inspection | 12/18/2013 | 12/19/2013 | 12/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin. Phase 2B and ER staff lounge. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Conference | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Wall cover | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Final | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
Tom. Fire Final will be completed at 8:00am on Monday,9/23/13. Any time after that would be great. Brad Turk. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk PHASE 2A OK
|
FIRE-Final Inspection | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Area 2A life safety passed.
|
BLD-Ceiling Grid Inspection | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk phase 2 ok
|
BLD-Framing/Rough-in | 6/28/2013 | 7/1/2013 | 7/1/2013 | A | PASS |
Jim Storey
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk t line north framing ok
|
BLD-Conference | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Tom Arcoraci
|
|
|
Wall cover for Phase 2A. Jim Martin ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Foundation | 5/6/2013 | 5/6/2013 | 5/6/2013 | P | PASS |
Tom Arcoraci
|
|
|
We would like to have a 1:30 inspection. St Al''s ED Expansion. Jim Martin. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk si on site
|
FIRE-Conference | 3/18/2013 | 3/18/2013 | 3/18/2013 | P | DONE |
Troy Cobbley
|
|
|
Brad and I went over fire alarm in phase two waiting area.
|
FIRE-Final Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 | A | PART |
Troy Cobbley
|
|
|
Phase one life safety passed.
|
BLD-Final | 3/6/2013 | 3/7/2013 | 3/7/2013 | P | PART |
Tom Arcoraci
|
|
|
Jim Martin ###-#### >> Inspection requested via web by Brad Turk phase one ok for final
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for a conference not a final inspection. Building confrence on fire life satety Phase 1. Jim Martin ###-#### >> Inspection requested via web by Brad Turk
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/6/2013 | P | CANC |
Troy Cobbley
|
|
|
Building confrence for phasing structure of building permit and Life Safety. Contact Jim Martin ###-#### >> Inspection requested via web by Brad Turk Inspection cancelled from web by: Brad Turk
|
BLD-Conference | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Tom Arcoraci
|
|
|
If we could have you come out at 12:45 or 1:00 today, we would like to do a walk through of existing corridor and new addition. Please contact Jim Martin. ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Wall cover | 1/24/2013 | 1/25/2013 | 1/25/2013 | P | PASS |
Tom Arcoraci
|
|
|
This will be for the North side of St.Al''s ED expansion. Friday at 1:00pm would work great. Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 1/9/2013 | 1/10/2013 | 1/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
Please contact Jim Martin with question or concerns: ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for cover
|
BLD-Framing/Rough-in | 1/4/2013 | 1/4/2013 | 1/4/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/2/2013 | 1/2/2013 | 1/2/2013 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
|
BLD-Conference | 12/14/2012 | 12/17/2012 | 12/24/2012 | A | PASS |
Tony Young
|
|
|
We would like this to be around 11:00am if possible. This will be a walk through of the project as to where we are at and direction we are going. Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk upper areas on walls ok to cover,, ok to put on 2nd layers in other areas as needed
|
BLD-Concrete | 11/15/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Tom Arcoraci
|
|
|
Pouring at 2 Rebar - Micah Phone #: ###-####
|
BLD-Conference | 10/26/2012 | 10/26/2012 | 10/26/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: 2085735147 >> Inspection requested via mobile web by Jim Martin 2 hr wall wip ok
|