Permit Information
Permit NumberBLD12-01950
StatusFinaled
Name ESI
Site Address 3305 N COLE RD
Project NameWalmart Neighborhood Market Ta
Customer Number 
ePlanReviewNo
Description
(WALMART Neighborhood Market – Cole Village Shopping Center) This building will be fire sprinklered for area increase under BLD12-01951. Permit is to remodel an existing 12,720 square foot mercantile tenant space. Work is to include: demolition of existing non-bearing partition walls, demolition of existing plumbing / electrical / mechanical, demolition of existing 2 hr. area separation wall between this tenant and adjacent, [construction of new: man door openings in west facing wall, steel post and beam construction in place of 2 hr area separation wall, and a raised floor slab (approximately 12 inches), removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and interior finishes. This building is not fire sprinklered; however, this building is required to be sprinklered prior to any tenant occupying the building. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20133/25/20133/25/2013PPASS
DetailsJim Sly
devon Phone #: ###-####
C/C issued.
DOC - Permit Finaled3/25/20133/25/20133/25/2013PPASS
DetailsJim Sly
BLD-Final3/12/20133/12/20133/12/2013PNR
DetailsJim Sly
Devon Phone #: ###-####
Talked to Devon. Need Plumbing final and final letter of approval from MTI......Stamped by Engineer of record..signed and dated. Need to verify if electrical needs to be finaled.......Not check marked on required signature list.
BLD-Other2/14/20132/14/20132/14/2013PPART
DetailsJim Sly
Columns - Devin Phone #: ###-####
Inspection of CMU installation above new steel columns and beams. Beam bolting connection to New CMU wall. Bolting attachment of ledger for roof support to CMU wall. OK Pending MTI inspection, report and approval.
BLD-Foundation1/3/20131/4/20131/4/2013ACANC
DetailsJim Sly
Beginning masonry foundation with rebar reinforcement for new fully grouted shear- wall along grid 9, between E.5 and G. MTI will be on site for continuous inspection- grout of masonry scheduled for 12 noon. Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI inspection, tests and approvals.
BLD-Footing12/27/201212/28/201212/28/2012APASS
DetailsJim Sly
Footing placement for new shearwall (20 yards)at 10:00AM.
MTI will be on site for visual inspection of six (6)embedded rebar with epoxy to tie in old footing, rebar placement for reinforcement, will collect cylinders for testing @ 10:00AM Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI inspection, tests and approvals.
BLD-Foundation12/19/201212/20/201212/20/2012APART
DetailsJim Sly
MTI also scheduled for inspection of rebar @ 8AM
Please call for timing. Phone #: ###-#### >> Inspection requested via web by Philip Allen
Front of Bldg. Footing tie into slab. OK pending MTI special insp. tests and approvals.
BLD-Footing12/6/201212/7/201212/7/2012PPASS
DetailsJim Sly
Embedded rebar with Epoxy for new column footing tie in along grid 9. Special inspection has been recorded- copies of special inspections are on site. Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI insp, tests and approvals.
BLD-Footing11/14/201211/15/201211/15/2012APART
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Philip Allen
Eastern most Column footing OK pending MTI insp, tests and approvals.
BLD-Footing11/13/201211/14/201211/14/2012PCANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen