Description
8th and Main Tower (Shell and Core) - To finish the exterior of the building including installing all building exterior walls, glazing, roofing and insulation. To finish the core areas at all floors. The core areas of all floors include stair enclosures, elevators with elevator lobby, fire service lobby, electrical room and mechanical shafts. The core areas at the 1st, 2nd and 6th thru 17th floors include men's and women's restrooms. The core areas at the 3rd, 4th and 5th floors include a bike storage room. The basement level is finished with storage rooms, electrical and communications rooms, corridors, mail rooms and security office. The 1st floor core includes entry vestibule and lobby, escalator, fire command center, exit passageway and corridors. The 2nd floor core includes a circulation area and a corridor to the Eastman garage. The 18th floor is the mechanical floor and contains all building mechanical equipment. This building is fully fire sprinklered with a full fire alarm system for high-rise provisions. Separate fire protection permits are required; as regulated by the Fire Department. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/13/20141/13/20141/16/2014PPASS
DetailsForrest France
BLD-Final1/7/20141/10/20141/16/2014PPASS
DetailsDave Hannah
FIRE-Final Inspection1/7/20141/10/20141/10/2014APASS
DetailsForrest France
DOC - Permit Finaled  12/19/2013 DONE
FIRE-Final Inspection12/17/201312/18/201312/18/2013PPASS
DetailsForrest France
Shell permit life safety inspection completed acceptable.
BLD-Final12/17/201312/18/201312/18/2013PPASS
DetailsDave Hannah
Shell and Core Building Final Final with Dave Hannah, requested by Jamal, PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final12/12/201312/16/201312/17/2013APART
DetailsDave Hannah
Stairwells & egress - Adam Phone #: ###-#### stairs towers ok
BLD-Final12/6/201312/13/201312/13/2013ACANC
DetailsDave Hannah
AM inspection of Stairwells, per Jamal. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Other12/9/201312/12/201312/12/2013APART
DetailsDave Hannah
Penthouse final interior inspection per Jamal. Thursday AM. Thanks akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson penthouse ok
BLD-Final12/6/201312/11/201312/12/2013APART
DetailsDave Hannah
Final Inspection of Garage Levels 3, 4, and 5. Request per Jamal. Wed Dec 11th AM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final12/6/201312/12/201312/12/2013ANR
DetailsDave Hannah
Inspection of core and shell interior signage, per Jamal. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final12/6/201312/10/201312/11/2013APEND
DetailsDave Hannah
Final Shell and Core inspection of Electrical Rooms, per Jamal. AM Tuesday Dec 10th. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked elec rooms with jamal still needs to seal up pentations on three levels
BLD-Framing/Rough-in12/5/201312/5/201312/9/2013PPART
DetailsDave Hannah
per dave hannah ceiling in alley ok to cover
BLD-Other11/22/201311/26/201311/27/2013PPART
DetailsDave Hannah
Inspection request for Reflective tape in stairways. Requested by Jamal for PM, Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson thats instilled is ok I still need to check on several items.
BLD-Final11/22/201311/26/201311/27/2013PPART
DetailsDave Hannah
Request to walk stairway 1 and 2, top to bottom, final inspection. PM inspection with Jamal. Thanks. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked stairs crews still working on them but doors and door hardware ok
BLD-Framing/Rough-in11/22/201311/22/201311/25/2013PPASS
DetailsDave Hannah
Exterior Perimeter at 17th Floor, Shell and Core scope. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Other11/22/201311/25/201311/25/2013APASS
DetailsDave Hannah
Request by G&G Firestop assembly, alleyway, at Grid Line 6. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference11/19/201311/19/201311/20/2013PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Final11/14/201311/15/201311/15/2013APART
DetailsDave Hannah
Request for Final inspection of Shell and Core Basement scope of work. Requested by Jamal, AM, 10:30 if possible. Thanks, Adam. Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked basement with Jamal four items to check on
BLD-Final11/12/201311/13/201311/13/2013APART
DetailsDave Hannah
Request for 10:30 Inspection of restrooms (shell and core)levels 11 to 17th with Jamal. Thanks, Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson restroom ada pass
BLD-Final11/6/201311/12/201311/12/2013ACANC
DetailsTom Arcoraci
Request for 10:30 inspection of restrooms, (shell and core) levels 11 to 17th, with Jamal. Thanks. Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final11/1/201311/5/201311/6/2013APART
DetailsDave Hannah
Shell and Core Restroom Inspection Levels 1-10, Shell and Core Permit work. Jamal is requesting this for 10:30 AM. Phone #: ###-#### >> Inspection requested via web by Adam Johnson floors 1and 2 ok 6 thru 9 ada stalls only 59 inchs wide
BLD-Framing/Rough-in11/1/201311/5/201311/5/2013AFAIL
DetailsDave Hannah
Wall perimeter inspection at 9th and 10th floor, exterior walls, core and shell scope of work, conformation of cover. Requesting in conjunction with 10:30 inspection of Shell and Core restrooms. Thanks. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference10/8/201310/10/201310/14/2013APEND
DetailsDave Hannah
Weekly Shell and Core inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference9/30/201310/3/201310/4/2013APART
DetailsDave Hannah
Weekly Shell and core inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked project with adam
BLD-Conference9/17/20139/24/20139/24/2013ADONE
DetailsDaryl Spivey
Meeting at 9:30 in construction office Phone #: ###-####
BLD-Conference8/26/20138/29/20138/29/2013ADONE
DetailsDave Hannah
Weekly Core and Shell Inspection Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/19/20138/22/20138/23/2013APASS
DetailsDave Hannah
Weekly Inspection Walk, Core and Shell. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/12/20138/15/20138/19/2013APASS
DetailsDave Hannah
Weekly Inspection Walk, Core and Shell. Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/5/20138/8/20138/9/2013ADONE
DetailsDave Hannah
Weekly Inspection walk for Core and Shell. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference7/29/20138/1/20138/9/2013ADONE
DetailsDave Hannah
Weekly Job Inspection Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference7/22/20137/25/20137/30/2013APASS
DetailsDave Hannah
Weekly Shell and Core inspection. Adam will be out, please check in with John, FCS, and Roger, ESI, ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference7/16/20137/18/20137/18/2013APASS
DetailsTom Arcoraci
Weekly inspectoin walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson will meet with dave later
BLD-Conference7/8/20137/11/20137/11/2013APART
DetailsDave Hannah
Weekly Inspection Request. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/24/20136/27/20136/27/2013ACANC
DetailsDave Hannah
Weekly Inspection Walk. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/7/20136/13/20136/13/2013ADONE
DetailsDave Hannah
Weekly Job Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/11/20136/12/20136/12/2013ACANC
DetailsDave Hannah
Inspection Requested for 16th Floor Restrooms. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/4/20136/5/20136/11/2013APART
DetailsDave Hannah
Rescheduled Thursday to Wednesday, Follow up on items from Tuesdays AM walk. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson see sign off sheets
BLD-Conference6/3/20136/6/20136/4/2013ACANC
DetailsDave Hannah
Weekly inspection walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson
BLD-Conference5/24/20135/24/20135/24/2013APART
DetailsDave Hannah
Dave, Looking for the following Inspection Items:
Meet with John Woods, FCS. Look at 11th Floor Perimeter, and confirm inspection at 10th Floor. Thanks. Adam Phone #: ###-#### see>> Inspection requested via web by Adam Johnson see sign off book for locations
BLD-Conference5/20/20135/23/20135/24/2013APART
DetailsDave Hannah
Weekly Job Inspection. Please contact Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson see sign off book for locations.
BLD-Conference5/15/20135/16/20135/22/2013APART
DetailsDave Hannah
Weekley Inspection Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson see sign off book
BLD-Conference5/6/20135/9/20135/9/2013APART
DetailsDave Hannah
Weekly Job Walk ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover restrooms south stairtower and outer wall of mec shafts floors 10 11 & 12
BLD-Conference4/29/20135/2/20135/6/2013APART
DetailsDave Hannah
Weekly Inspection ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to spray curtain wall fire safeing 7,8 and 9th floors
BLD-Conference4/17/20134/17/20134/22/2013APART
DetailsDave Hannah
Phone #: 2084841503 >> Inspection requested via mobile web by Adam ( ok to cover restrooms 1,2 and 6th floors)
BLD-Conference4/12/20134/18/20134/22/2013ADONE
DetailsDave Hannah
AT ESI OFFICE 9AM meeting with ele,plm,mec,& fir inspectors
BLD-Conference4/12/20134/18/20134/18/2013ADONE
DetailsTroy Cobbley
Meeting AT ESI OFFICE with other inspectors to discuss the documentation of inspections
BLD-Conference4/12/20134/18/20134/18/2013ADONE
DetailsTroy James
meeting AT ESI OFFICE 9AM with David Hannah
BLD-Conference4/12/20134/18/20134/18/2013ADONE
DetailsBob Reichert
meeting AT ESI OFFICE 9AM with David Hannah 327 did
BLD-Conference4/12/20134/18/20134/18/2013ADONE
DetailsDaryl Spivey
meeting AT ESI OFFICE 9AM with David Hannah
meeting to coordinate consistency for recording inspections........ds
BLD-Conference4/8/20134/11/20134/17/2013ADONE
DetailsDave Hannah
Weekly Inspection Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference3/25/20133/28/20134/2/2013ADONE
DetailsDave Hannah
Weekly Inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference3/19/20133/21/20133/22/2013PPASS
DetailsDave Hannah
Phone #: 2084841503 >> Inspection requested via mobile web by Adam
BLD-Framing/Rough-in3/12/20133/12/20133/21/2013APASS
DetailsDave Hannah
Contractors meeting and walk project.
BLD-Conference3/12/20133/14/20133/15/2013APART
DetailsDave Hannah
Weekly Inspection walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked floors basement to 13flr is plans in ESIs office for areas ok to cover.
BLD-Conference3/4/20133/7/20133/12/2013ADONE
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Adam Johnson wolked project
BLD-Framing/Rough-in2/28/20132/28/20133/1/2013APART
DetailsDave Hannah
John check framing floors 12 to basement John and I walked floors he needs to seal up between framing and beams and floors inter layer of shaft wall before placing outer layers of sheetrock
BLD-Conference2/11/20132/14/20132/20/2013PPART
DetailsDave Hannah
8th and Main Inspection Walk.BP2 Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in2/14/20132/14/20132/14/2013APART
DetailsDave Hannah
8th and Main Inspection Walk.BP2 Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked floors 10 down to basement framing crews working on shafts stair towers elevators halls elec rooms ect shafts are ok crews have shaft board on inside and are two siding elec rooms still waiting on trades roughins