BLD-Final | 1/23/2013 | 1/24/2013 | 1/24/2013 | A | PASS |
Tony Young
|
|
|
Austin Phone #: ###-####,, ok for perm occ.
|
BLD-Final | 1/16/2013 | 1/16/2013 | 1/17/2013 | P | NR |
Dave Hannah
|
|
|
erin Phone #: ###-####
|
BLD-Final | 1/2/2013 | 1/3/2013 | 1/3/2013 | A | PART |
Dave Hannah
|
|
|
jim Phone #: ###-####ok fdor temp occ needs to lower break room sink to 34 inchs
|
FIRE-Final Inspection | 12/31/2012 | 1/2/2013 | 1/2/2013 | P | PASS |
Forrest France
|
|
|
Field verified noted correction items are complete. Life safety inspection passed.
|
BLD-Final | 12/26/2012 | 12/27/2012 | 12/28/2012 | A | FAIL |
Dave Hannah
|
|
|
dale - call 30 mins prior to meet Phone #: ###-####
|
BLD-Conference | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Dave Hannah
|
|
|
10ish - Benjamin Phone #: ###-####
|
FIRE-Conference | 12/27/2012 | 12/27/2012 | 12/27/2012 | P | DONE |
Forrest France
|
|
|
Regarding correction notice items.
|
FIRE-Final Inspection | 12/26/2012 | 12/26/2012 | 12/27/2012 | P | FAIL |
Forrest France
|
|
|
Correction items noted include; door hardware at the restroom and pocket doors, post the fire extinguisher with a current certification tag, repair exit sign/EM light on backup power source, missing stamped plan set on site for field verification and review.
|
BLD-Framing/Rough-in | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | PASS |
Dave Hannah
|
|
|
Please call 20min prior for access - Jim Phone #: ###-####
|