BLD-Final | 12/20/2012 | 12/21/2012 | 12/21/2012 | A | PASS |
Mike Jordan
|
|
|
jared Phone #: ###-####
|
DOC - Permit Finaled | 12/21/2012 | 12/21/2012 | 12/21/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 12/19/2012 | 12/20/2012 | 12/20/2012 | P | FAIL |
Mike Jordan
|
|
|
jared Phone #: ###-####. Provide blower door test results and post or the 3rd party inspection airseal report. Post the required energy cert. Correction notice posted.
|
BLD-Final | 12/18/2012 | 12/19/2012 | 12/19/2012 | P | NR |
Mike Jordan
|
|
|
call for access code -Jared Phone #: 8. Stilll has open electrical and mech permits that ned finaled first.
|
BLD-Framing/Rough-in | 10/12/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Mike Jordan
|
|
|
Insulation as well - Jared Phone #: ###-####
|
BLD-Energy code compliance | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Mike Jordan
|
|
|
Insulation as well - Jared Phone #: ###-####
|
BLD-Framing/Rough-in | 10/10/2012 | 10/11/2012 | 10/11/2012 | A | FAIL |
Tom Arcoraci
|
|
|
Jared Phone #: ###-#### notice posted
|
BLD-Wall Bracing | 9/27/2012 | 9/28/2012 | 9/28/2012 | A | PART |
Mike Jordan
|
|
|
jared Phone #: ###-####. Exterior wall bracing ok. Needs to provide CS-PF over openings at master bath. Will check at framing inspection.
|
BLD-Foundation | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PART |
Mike Jordan
|
|
|
chris Phone #: ###-####
|
BLD-Footing | 9/7/2012 | 9/10/2012 | 9/10/2012 | A | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|