Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD12-02258
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 5143 E WARM SPRINGS AVE
Project NameThe Dental Center at Harris Ra
Customer Number 
ePlanReviewYes
Description
Dental Center at Harris Ranch - To construct a new 2,510 square foot, one story, wood framed dental office building and related site improvements. This facility will include a 1 hour rated exterior medical gas closet with one fire sprinkler head. A separate fire sprinkler permit will be required for this work; as regulated by the Fire Department. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/12/20137/15/20137/16/2013APASS
DetailsJim Sly
dave Phone #: ###-####
OK for Perm Occ.
BLD-Final6/4/20136/4/20136/4/2013PPART
DetailsDave Hannah
dave Phone #: ###-#### ok for temp occ ok for perm occ after med gas is finaled
FIRE-Final Inspection5/30/20135/31/20135/31/2013APASS
DetailsForrest France
Fire life safety inspection completed and passed.
BLD-Framing/Rough-in5/8/20135/9/20135/9/2013APASS
DetailsDave Hannah
Ceiling grid inspection please--Dave Phone #: ###-####
BLD-Ceiling Grid Inspection5/7/20135/8/20135/8/2013ANH
DetailsJim Sly
dave Phone #: ###-####
Called contractor.....No access.
BLD-Ceiling Grid Inspection5/3/20135/3/20135/3/2013PFAIL
DetailsDave Hannah
dave Phone #: ###-#### needs wires to speakers
FIRE-Conference4/1/20134/1/20134/1/2013PDONE
DetailsForrest France
FIRE-Conference3/19/20133/19/20133/19/2013ADONE
DetailsForrest France
BLD-Energy code compliance3/11/20133/12/20133/12/2013APASS
DetailsDave Hannah
dave Phone #: ###-####
BLD-Framing/Rough-in3/1/20133/1/20133/1/2013APASS
DetailsDave Hannah
ok to insulate contractor will fix one hour walls around med gas room
BLD-Conference2/26/20132/27/20133/1/2013APART
DetailsDave Hannah
please call ahead - dave Phone #: ###-#### met arch and contractor on site they will remove fur down so they can build one hour walls around med gas room;
BLD-Framing/Rough-in2/21/20132/22/20132/22/2013ANR
DetailsJim Storey
dave Phone #: ###-####
BLD-Other2/4/20132/4/20132/4/2013PPASS
DetailsDave Hannah
dave - fire rated eaves Phone #: ###-#### east and west side eaves ok to cover
BLD-Other1/17/20131/17/20131/17/2013PPASS
DetailsDave Hannah
exterior sheer wall inspection >> Inspection requested via web by Dave Bashista
BLD-Other1/9/20131/10/20131/10/2013ADONE
DetailsDave Hannah
roof nail inspection Phone #: ###-#### >> Inspection requested via web by Dave Bashista roof covered with snow but no inspection needed
BLD-Foundation12/13/201212/13/201212/13/2012APASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation12/11/201212/12/201212/13/2012PNR
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation12/5/201212/7/201212/7/2012ACANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing12/7/201212/7/201212/7/2012APASS
DetailsDave Hannah
BLD-Footing12/5/201212/6/201212/6/2012PCANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron