BLD-Final | 6/28/2013 | 7/1/2013 | 7/1/2013 | P | PASS |
Jim Sly
|
|
|
Please call 30mins ahead - Harvey Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 6/28/2013 | 7/1/2013 | 7/1/2013 | A | FAIL |
Troy Cobbley
|
|
|
Duct detector is missing the sample tubes and all of them are not wired to provide immediate shut down as required byIMC
|
BLD-Conference | 6/28/2013 | 6/28/2013 | 6/28/2013 | P | DONE |
Jim Sly
|
|
|
Nick Phone #: ###-####
|
FIRE-Final Inspection | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign over the main exit door, repair the emergency lighting at the north end of the lobby and provide testing for the three duct smoke detectors.
|
BLD-Ceiling Grid Inspection | 5/29/2013 | 5/30/2013 | 5/30/2013 | A | PASS |
Mike Jordan
|
|
|
Nick Phone #: ###-####. Grid ok.
|
BLD-Energy code compliance | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | PASS |
Jim Sly
|
|
|
nick Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2013 | 3/11/2013 | 3/11/2013 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2013 | 3/7/2013 | 3/8/2013 | P | NR |
Jim Sly
|
|
|
nick Phone #: ###-#### Walk thru.....with contractor.
|
BLD-Wall Bracing | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Jim Sly
|
|
|
Nick Phone #: ###-####
|
BLD-Footing | 12/5/2012 | 12/6/2012 | 12/6/2012 | A | PART |
Jim Sly
|
|
|
Rebar - Ed Phone #: ###-#### Internal....and Drive thru (column) footings OK pending MTI inspection, tests and approvals.
|
BLD-Foundation | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Jim Sly
|
|
|
Nick Phone #: ###-#### OK pending MTI insp, tests and approvals.
|
BLD-Footing | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Jim Sly
|
|
|
late afternoon - Nick Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|