BLD-Framing/Rough-in | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Mike Jordan
|
|
|
Nivi (said talked to you so between 8-9) Phone #: ###-####
|
DOC - Permit Finaled | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/3/2013 | 6/4/2013 | 6/4/2013 | A | FAIL |
Mike Jordan
|
|
|
nabi Phone #: ###-####. Needs to reapir structure as per approved plans.
|
BLD-Conference | 5/31/2013 | 6/3/2013 | 6/3/2013 | P | DONE |
Mike Jordan
|
|
|
Before 4 - Nabi Phone #: ###-####. Needs to remove some exterior sheathing to expose framing members.
|
BLD-Final | 5/31/2013 | 6/3/2013 | 6/3/2013 | P | CANC |
Mike Jordan
|
|
|
Before 4 - Nabi Phone #: ###-####
|