BLD-Final | 3/28/2013 | 3/29/2013 | 3/29/2013 | A | PASS |
Dave Hannah
|
|
|
tony - call 30 mins prior Phone #: ###-####
|
DOC - Permit Finaled | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/26/2013 | 3/27/2013 | 3/28/2013 | A | DEFR |
Jim Storey
|
|
|
Tony-PLease call at least 30 mins prior to insepction Phone #: ###-#### pending ele
|
FIRE-Final Inspection | 3/26/2013 | 3/26/2013 | 3/27/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled. New door hardware can be verified at structural final as discussed.
|
FIRE-Final Inspection | 3/19/2013 | 3/20/2013 | 3/21/2013 | A | FAIL |
Forrest France
|
|
|
Door hardware at the second storefront exit still needs revision. Fire extinguishers have been serviced.
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | FAIL |
Forrest France
|
|
|
C/N items include- provide current certifications for the existing fire extinguishers, provide approved hardware at the second storefront exit door.
|
FIRE-Final Inspection | 1/22/2013 | 1/22/2013 | 1/22/2013 | P | PART |
Forrest France
|
|
|
Okay to cover drop ceilings- Life safety final NR.
|
BLD-Conference | 1/17/2013 | 1/18/2013 | 1/18/2013 | A | PASS |
Jim Storey
|
|
|
please call ahead for access - tony Phone #: ###-#### ceilling and floor assembly ok pending others.
|
BLD-Framing/Rough-in | 1/9/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Jim Storey
|
|
|
tony please call 30 min before going out Phone #: ###-####2nd floor wall ok
|