BLD-Final | 3/18/2013 | 3/18/2013 | 3/18/2013 | P | PASS |
Tony Young
|
|
|
Brandy--PLease call at least 30 mins prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 3/18/2013 | 3/18/2013 | 3/18/2013 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
BLD-Other | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PART |
Mike Jordan
|
|
|
Jim ###-#### // bracket insp. Work in progress. tube steel structure erected with A-325 bolts as per approved plans. Contractor in progress on installing treated boards prior to slats. Noted to contractor that tec screws need to be installed at 12" o.c. not 16 " o.c.
|
BLD-Footing | 12/13/2012 | 12/14/2012 | 12/14/2012 | A | PASS |
Tony Young
|
|
|
jim Phone #: ###-####,, per plan,, ok
|