Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02938
StatusFinaled
Name GUHO CORP
Site Address 1620 W RIVER ST
Project NameInterfaith Sanctuary Housing
Customer Number 
ePlanReviewNo
Description
(INTERFAITH SANCTUARY HOUSING SERVICES - Phased Const.) Records indicate this building is fully sprinklered with NFPA 13 system for an "R1" occupancy use group based on Ch. 9, 2006 IBC and a manual fire alarm system per NFPA 72. This phase of construction involves select interior demolition of non-bearing walls and select interior doors; completing or creating 1-hour fire partitions between sleeping units by use of U.L. Design System U305; installation of accessible transfer shower in existing unisex restroom and an accessible roll-in type shower in conjunction with two regular showers within the existing Men's restroom area; add ceiling access door panel in Men's restroom area; construct new fire partitions to create office 116, and sleeping unit rooms 117, 118 & 119; a new alcoved access/egress door to room 110; new walls and doors to create a utility room off of room 109 for water heater and new floor sink and to separate room 109 from the common 1-hour fire rated corridor exit egress system that serves rooms 105 & 109. The new corridor door is required to be a 20 minute listed & labeled, self-closing, fire / smoke door / frame assembly; all as indicated on plans and in attached plan review comments / conditions of all reviewing agencies as part of the approved plans, requiring code compliance. The upgrade agreement is attached to BLD08-02236. Separate Fire Permits will be required to modify the existing building fire protection systems; as regulated by the Fire Department. drs/srz
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  4/1/2014 DONE
BLD-Final4/25/20134/25/20134/25/2013APASS
DetailsBob Archibald
Corrections made ok
BLD-Final2/20/20132/20/20132/20/2013APEND
DetailsBob Archibald
Need ADA shower bench and sealing of through penetrations in rated walls.
BLD-Framing/Rough-in1/18/20131/18/20131/18/2013PPART
DetailsBob Archibald
CN issued. Approved framing for cover except corridoor wall on west end of building (pending sound decision). Thermal barrier required on insulation at south end of building.
BLD-Framing/Rough-in1/24/20131/24/20131/24/2012APART
DetailsBob Archibald
West corridoor wall approved for cover (no sound design required). Termal barrier not reviewed or approved on south exterior wall.