BLD-Final | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Jim Sly
|
|
|
derek Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/16/2013 | 4/16/2013 | 4/16/2013 | P | CANC |
Jim Sly
|
|
|
Derik phone
|
BLD-Final | 4/15/2013 | 4/16/2013 | 4/16/2013 | A | NR |
Jim Sly
|
|
|
Derik Phone #: ###-#### Need Mech final.
|
BLD-Ceiling Grid Inspection | 4/3/2013 | 4/4/2013 | 4/4/2013 | A | CANC |
Jim Sly
|
|
|
zach Phone #: ###-#### per Ed cancel this inspection request
|
BLD-Framing/Rough-in | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Jim Sly
|
|
|
Derrick ###-####
|
BLD-Ceiling Grid Inspection | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Jim Sly
|
|
|
Zach ###-####
|
BLD-Framing/Rough-in | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | CANC |
Jim Sly
|
|
|
Ceiling grid inspection-Derrick Phone #: ###-#### Re-sched.......
|
BLD-Ceiling Grid Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | CANC |
Jim Sly
|
|
|
zack Phone #: ###-#### Re-sched........
|
FIRE-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 2/20/2013 | 2/20/2013 | 2/20/2013 | P | PASS |
Jim Sly
|
|
|
DERRICK Phone #: ###-####
|