BLD-Final | 8/27/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Jim Storey
|
|
|
late morning/early afternoon - jim Phone #: ###-####
|
FIRE-Final Inspection | 8/15/2013 | 8/16/2013 | 8/16/2013 | A | PASS |
Forrest France
|
|
|
Inspection passed, fire life safety finaled.
|
FIRE-Final Inspection | 8/14/2013 | 8/14/2013 | 8/14/2013 | A | NR |
Forrest France
|
|
|
Pending C/N items
|
FIRE-Final Inspection | 8/8/2013 | 8/12/2013 | 8/12/2013 | A | PART |
Forrest France
|
|
|
Items noted during fire life safety inspection include; hydrant orientation per BMC title 7, buffing equipment is not yet installed for verification of note #2 items 1-3, operational permit req. per fire code review note #7, post signage per note #10(B) as discussed, gates are not yet installed, see note #8 for racking over 8". EM lights/exit signs and PFE's okayed.
|
BLD-Ceiling Grid Inspection | 7/30/2013 | 7/31/2013 | 7/31/2013 | P | PASS |
Jim Storey
|
|
|
jim Phone #: ###-####
|
BLD-Wall Bracing | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PASS |
Jim Storey
|
|
|
ron Phone #: ###-#### gyp sheer ok to cover
|
BLD-Energy code compliance | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Jim Storey
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2013 | 6/28/2013 | 6/28/2013 | P | PASS |
Jim Storey
|
|
|
jim Phone #: ###-#### paripet framing at west roof ok to cover.
|
BLD-Framing/Rough-in | 6/25/2013 | 6/26/2013 | 6/26/2013 | P | PART |
Jim Storey
|
|
|
Jim Phone #: ###-#### framing ok pending plm
|
BLD-Framing/Rough-in | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | PART |
Jim Storey
|
|
|
tim Phone #: ###-#### diaphram nailling and hardware ok on mez. framing stairs ok rise and run.
|
BLD-Conference | 6/11/2013 | 6/11/2013 | 6/11/2013 | A | PASS |
Jim Storey
|
|
|
reviewed stair drawnings for rise and run nose to nose/ handrail requirments/ 1 hr protection and support.
|
BLD-Other | 5/30/2013 | 6/3/2013 | 6/3/2013 | A | PART |
Jim Storey
|
|
|
Metal building roof insp//Jim Phone #: ###-#### change to deck atchment hilti sys. need review by engineer of record to field review of drag strut change to resolve forces/ nuts to be tightened at pannel angle/ r-25 required for roof deck insulation/ si ro address in report.
|
BLD-Foundation | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Jim Storey
|
|
|
JIM Phone #: ###-####
|
BLD-Footing | 5/20/2013 | 5/21/2013 | 5/21/2013 | P | PASS |
Jim Storey
|
|
|
Jimmy-early as possible please--rebar inspection please Phone #: ###-#### pads west canopy rebar ok
|
BLD-Footing | 5/3/2013 | 5/6/2013 | 5/6/2013 | A | PASS |
Jim Storey
|
|
|
Jim-Re-bar inspection Phone #: ###-####
|
BLD-Footing | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Jim Storey
|
|
|
late AM for rebar - Jim Phone #: ###-#### north and east ft ok
|
BLD-Other | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Jim Storey
|
|
|
rebar - jim Phone #: ###-####
|
BLD-Other | 4/19/2013 | 4/24/2013 | 4/24/2013 | A | PASS |
Jim Storey
|
|
|
jim - rebar Phone #: ###-#### si reports ok
|
BLD-Other | 4/19/2013 | 4/23/2013 | 4/24/2013 | A | PASS |
Jim Storey
|
|
|
jim - rebar Phone #: ###-#### si reports ok
|
BLD-Other | 4/19/2013 | 4/22/2013 | 4/22/2013 | A | PASS |
Tom Arcoraci
|
|
|
jim - rebar Phone #: ###-#### si
|
BLD-Foundation | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | PART |
Jim Storey
|
|
|
jim Phone #: ###-#### placed with s/i ok
|
BLD-Footing | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Jim Storey
|
|
|
late am please// footing rebar // Jim Phone #: ###-#### se dock ft and rebar ok
|
BLD-Footing | 3/22/2013 | 3/25/2013 | 3/25/2013 | A | PASS |
Jim Storey
|
|
|
JIm-Late am please Phone #: ###-#### 5 interior peirs ok pending si report
|
BLD-Footing | 3/20/2013 | 3/21/2013 | 3/21/2013 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### sub grade ok at dock area engineer redesign for step footting due to rock out cropings encountered in two locations. si reports pending.
|
BLD-Conference | 2/21/2013 | 2/22/2013 | 2/22/2013 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### reviewed for si and esc before exuvation begins
|