Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD12-03094
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 450 E GOWEN RD
Project NameCommercial Tire
Customer Number 
ePlanReviewNo
Description
Commercial Tire - To construct a new 48,500 square foot, one story, concrete tilt-up industrial building with a 1,500 square foot office mezzanine and related site improvements. The building will contain a tire sales area, tire installation area, administrative offices, tire storage warehouse and a tire retread plant. This building is fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20138/28/20138/28/2013APASS
DetailsJim Storey
late morning/early afternoon - jim Phone #: ###-####
FIRE-Final Inspection8/15/20138/16/20138/16/2013APASS
DetailsForrest France
Inspection passed, fire life safety finaled.
FIRE-Final Inspection8/14/20138/14/20138/14/2013ANR
DetailsForrest France
Pending C/N items
FIRE-Final Inspection8/8/20138/12/20138/12/2013APART
DetailsForrest France
Items noted during fire life safety inspection include; hydrant orientation per BMC title 7, buffing equipment is not yet installed for verification of note #2 items 1-3, operational permit req. per fire code review note #7, post signage per note #10(B) as discussed, gates are not yet installed, see note #8 for racking over 8". EM lights/exit signs and PFE's okayed.
BLD-Ceiling Grid Inspection7/30/20137/31/20137/31/2013PPASS
DetailsJim Storey
jim Phone #: ###-####
BLD-Wall Bracing7/9/20137/10/20137/10/2013APASS
DetailsJim Storey
ron Phone #: ###-#### gyp sheer ok to cover
BLD-Energy code compliance7/2/20137/3/20137/3/2013APASS
DetailsJim Storey
jim Phone #: ###-####
BLD-Framing/Rough-in6/27/20136/28/20136/28/2013PPASS
DetailsJim Storey
jim Phone #: ###-#### paripet framing at west roof ok to cover.
BLD-Framing/Rough-in6/25/20136/26/20136/26/2013PPART
DetailsJim Storey
Jim Phone #: ###-#### framing ok pending plm
BLD-Framing/Rough-in6/18/20136/19/20136/19/2013APART
DetailsJim Storey
tim Phone #: ###-#### diaphram nailling and hardware ok on mez. framing stairs ok rise and run.
BLD-Conference6/11/20136/11/20136/11/2013APASS
DetailsJim Storey
reviewed stair drawnings for rise and run nose to nose/ handrail requirments/ 1 hr protection and support.
BLD-Other5/30/20136/3/20136/3/2013APART
DetailsJim Storey
Metal building roof insp//Jim Phone #: ###-#### change to deck atchment hilti sys. need review by engineer of record to field review of drag strut change to resolve forces/ nuts to be tightened at pannel angle/ r-25 required for roof deck insulation/ si ro address in report.
BLD-Foundation5/21/20135/22/20135/22/2013APASS
DetailsJim Storey
JIM Phone #: ###-####
BLD-Footing5/20/20135/21/20135/21/2013PPASS
DetailsJim Storey
Jimmy-early as possible please--rebar inspection please Phone #: ###-#### pads west canopy rebar ok
BLD-Footing5/3/20135/6/20135/6/2013APASS
DetailsJim Storey
Jim-Re-bar inspection Phone #: ###-####
BLD-Footing4/30/20135/1/20135/1/2013APASS
DetailsJim Storey
late AM for rebar - Jim Phone #: ###-#### north and east ft ok
BLD-Other4/24/20134/24/20134/24/2013PPASS
DetailsJim Storey
rebar - jim Phone #: ###-####
BLD-Other4/19/20134/24/20134/24/2013APASS
DetailsJim Storey
jim - rebar Phone #: ###-#### si reports ok
BLD-Other4/19/20134/23/20134/24/2013APASS
DetailsJim Storey
jim - rebar Phone #: ###-#### si reports ok
BLD-Other4/19/20134/22/20134/22/2013APASS
DetailsTom Arcoraci
jim - rebar Phone #: ###-#### si
BLD-Foundation4/1/20134/1/20134/1/2013PPART
DetailsJim Storey
jim Phone #: ###-#### placed with s/i ok
BLD-Footing3/26/20133/27/20133/27/2013APASS
DetailsJim Storey
late am please// footing rebar // Jim Phone #: ###-#### se dock ft and rebar ok
BLD-Footing3/22/20133/25/20133/25/2013APASS
DetailsJim Storey
JIm-Late am please Phone #: ###-#### 5 interior peirs ok pending si report
BLD-Footing3/20/20133/21/20133/21/2013APASS
DetailsJim Storey
Jim Phone #: ###-#### sub grade ok at dock area engineer redesign for step footting due to rock out cropings encountered in two locations. si reports pending.
BLD-Conference2/21/20132/22/20132/22/2013APASS
DetailsJim Storey
Jim Phone #: ###-#### reviewed for si and esc before exuvation begins