BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PASS |
Jim Sly
|
|
|
ryan Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 5/16/2013 | 5/16/2013 | 5/16/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 4/5/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Jim Sly
|
|
|
Ryan ###-####
|
BLD-Conference | 4/4/2013 | 4/5/2013 | 4/5/2013 | A | CANC |
Jim Sly
|
|
|
ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | PART |
Jim Sly
|
|
|
ryan Phone #: ###-#### Framing pass No sticker for Mech rough-in.......Called Ryan....
|
BLD-Framing/Rough-in | 3/18/2013 | 3/19/2013 | 3/20/2013 | P | PART |
Jim Sly
|
|
|
Ryan Phone #: ###-#### Shear approved......only.
|
BLD-Wall Bracing | 3/15/2013 | 3/18/2013 | 3/18/2013 | A | FAIL |
Jim Sly
|
|
|
ryan Phone #: ###-#### Met with Contr......Eddie.
|
BLD-Footing | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | PASS |
Jim Sly
|
|
|
jeff Phone #: ###-####
|
BLD-Footing | 1/11/2013 | 1/14/2013 | 1/14/2013 | P | NR |
Jim Sly
|
|
|
jeff Phone #: ###-#### Temp in the teens.....Hole dug a few days ago....ground frozen....cannot allow to pour.
|