BLD-Final | 11/7/2013 | 11/7/2013 | 11/8/2013 | P | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/1/2013 | 11/1/2013 | 11/4/2013 | P | NR |
Dave Hannah
|
|
|
DEB Phone #: ###-####
|
BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | NR |
Dave Hannah
|
|
|
DEB Phone #: ###-#### needs hill side final first
|
BLD-Other | 9/9/2013 | 9/9/2013 | 9/10/2013 | P | PASS |
Dave Hannah
|
|
|
Deb -this is to check for fire treated wood - Steve will be on site to help Phone #: ###-####
|
BLD-Other | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | NR |
Dave Hannah
|
|
|
DEB- TREATED WOOD IN DRIVEWAY Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2013 | 8/14/2013 | 8/14/2013 | A | PART |
Jim Sly
|
|
|
fire rated soffits - deb Phone #: ###-#### Looked at 1x6 tongue and groove cedar and found stamps on the back of them. The stamps were smeared and un-readable. Should be fire rated treated. I talked to Deb about this and maybe we can get an invoice of what was ordered. Also told her if her soffit vents have not yet been approved by the City........that needs to be done. Don't know where treated cedar will be installed or even if it's been approved by Fire Dept. Deb to talk to Dave about this
|
BLD-Framing/Rough-in | 6/20/2013 | 6/20/2013 | 6/20/2013 | A | PASS |
Dave Hannah
|
|
|
Deb Jones Phone #: ###-####
|
BLD-Framing/Rough-in | 6/19/2013 | 6/19/2013 | 6/20/2013 | P | PASS |
Dave Hannah
|
|
|
Deb Jones Phone #: ###-####
|
BLD-Wall Bracing | 6/14/2013 | 6/14/2013 | 6/14/2013 | P | PASS |
Dave Hannah
|
|
|
deb Phone #: ###-####
|
BLD-Footing | 5/2/2013 | 5/3/2013 | 5/3/2013 | A | PASS |
Dave Hannah
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 4/4/2013 | 4/5/2013 | 4/5/2013 | A | NR |
Dave Hannah
|
|
|
Jerimiah Phone #: ###-####
|
BLD-Footing | 3/13/2013 | 3/14/2013 | 3/14/2013 | A | PART |
Tony Young
|
|
|
brent Phone #: ###-####,, interior slab ftgs
|
BLD-Foundation | 2/22/2013 | 2/25/2013 | 2/25/2013 | A | PART |
Tony Young
|
|
|
Brent Phone #: ###-####,,6" 4ft, 6" 6' and tall retaining walls ok per plan
|
BLD-Footing | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PART |
Dave Hannah
|
|
|
jess Phone #: ###-#### lower wall ok to place concrete
|
BLD-Footing | 2/12/2013 | 2/12/2013 | 2/13/2013 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 1/30/2013 | 1/30/2013 | 1/30/2013 | P | PASS |
Dave Hannah
|
|
|
Brent Phone #: ###-####
|
BLD-Foundation | 1/24/2013 | 1/24/2013 | 1/24/2013 | P | PART |
Tony Young
|
|
|
Brent Phone #: ###-####,, work in progress on retaining wall,, will cover and maybe pour Friday at 11am? then cover up for cure
|
BLD-Footing | 1/17/2013 | 1/18/2013 | 1/18/2013 | A | PART |
Dave Hannah
|
|
|
Brent Phone #: ###-#### first phase upper ftgs crew has ftgs covered and running heaters ok to place concrete
|
BLD-Footing | 1/16/2013 | 1/16/2013 | 1/16/2013 | P | FAIL |
Dave Hannah
|
|
|
Brent- Phone #: ###-#### ground was frozen and needed to add verts
|