FIRE-Final Inspection | 5/17/2013 | 5/20/2013 | 5/20/2013 | A | PASS |
Forrest France
|
|
|
Correction items field verified. Fire life safety passed.
|
BLD-Final | 5/17/2013 | 5/20/2013 | 5/20/2013 | A | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Final | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PART |
Jim Sly
|
|
|
Late in the day, if possible. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner OK for Temp Occ .OK for Perm when Fire Alarm, Fire Life, and Plumbing Perms. Corrections....Check (2) doors and hardware at front of Bldg. Check lower part of handrail at stairway to Mezzanine.
|
FIRE-Final Inspection | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PART |
Forrest France
|
|
|
Final pending project related fire alarm permit (under review), install three missing exit signs per approved plan and as discussed, post max. occupant load signs, doors and hardware at the main entry to be completed. Temporary occuapncy approved with conditions.
|
FIRE-Alarm Testing | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PART |
Forrest France
|
|
|
Completed functional test of two relocated manual pull stations and verification of offsite monitoring.
|
BLD-Framing/Rough-in | 5/2/2013 | 5/2/2013 | 5/3/2013 | P | PASS |
Dave Hannah
|
|
|
Kent-ceiling grid inspection please Phone #: ###-####
|
BLD-Framing/Rough-in | 4/19/2013 | 4/19/2013 | 4/19/2013 | A | PASS |
Dave Hannah
|
|
|
Please call Kent to coordinate. Request inspection at 11:00. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner
|