BLD-Final | 3/26/2013 | 3/26/2013 | 3/27/2013 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Final | 3/13/2013 | 3/13/2013 | 3/15/2013 | P | PART |
Dave Hannah
|
|
|
ed - call 15 mins prior Phone #: ###-#### everything is ok but I need mti final letter on spec inspection
|
FIRE-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety approved pending the 1A rated extinguisher is replaced with a min 2A10BC as discussed and per review comments.
|
BLD-Other | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Dave Hannah
|
|
|
rebar//Ed Phone #: ###-#### cmu wall ok to grout
|
BLD-Other | 2/12/2013 | 2/13/2013 | 2/13/2013 | A | PASS |
Dave Hannah
|
|
|
Concrete re-enforecement inspection--Ed--PLease call prior to inspection Phone #: ###-####
|
FIRE-Alarm Testing | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PASS |
Forrest France
|
|
|
Project related fire alarm permit work completed and passed inspection.
|
BLD-Other | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PART |
Dave Hannah
|
|
|
ed Phone #: ###-#### concrete drive ok to place concrete
|
BLD-Energy code compliance | 1/24/2013 | 1/25/2013 | 1/25/2013 | A | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 1/22/2013 | 1/22/2013 | 1/23/2013 | P | PART |
Tony Young
|
|
|
ed please call before going out Phone #: ###-####,, walls ok,, (front portal not ready) ok to insulate,, prior to cover there needs to be a mechanical inspection to see the condensate drain line
|
BLD-Conference | 1/14/2013 | 1/15/2013 | 1/15/2013 | A | DONE |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
FIRE-Conference | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire sprinkler and fire alarm system modifications that may be necessary due to the remodel work and change of use.
|