BLD-Final | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Jim Sly
|
|
|
tony Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | PART |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Ok for temp occ. Needs to remove keyed lock from exterior door to activity room.
|
FIRE-Final Inspection | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/28/2013 | 5/29/2013 | 5/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide all city approved small documents, provide panic hardware at all noted exits, provide remote annunciators/testing for the duct smoke detectors, provide correct occupant load sign number, provide testing of the exit signs/emergency lights.
|
BLD-Ceiling Grid Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Jim Sly
|
|
|
tony Phone #: ###-####
|
BLD-Conference | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PASS |
Jim Sly
|
|
|
Tony Phone #: ###-####
|
BLD-Energy code compliance | 4/15/2013 | 4/16/2013 | 4/16/2013 | A | PASS |
Jim Sly
|
|
|
Tony Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 4/11/2013 | 4/12/2013 | 4/15/2013 | P | PASS |
Jim Sly
|
|
|
tony Phone #: ###-####
|
BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | PASS |
Jim Sly
|
|
|
Shear wall and roof nailing Phone #: ###-#### >> Inspection requested via web by Kent Olsen
|
BLD-Foundation | 2/25/2013 | 2/26/2013 | 2/27/2013 | A | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### Select walls.....OK pending MTI inspection,tests and approvals.
|
BLD-Foundation | 2/21/2013 | 2/22/2013 | 2/22/2013 | P | PART |
Jim Sly
|
|
|
Tony Phone #: ###-#### East Stem Wall OK pending MTI insp. tests and approvals.
|
BLD-Foundation | 2/19/2013 | 2/20/2013 | 2/20/2013 | P | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### East and West walls OK pending MTI insp, tests and approvals.
|
BLD-Foundation | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### Footings at South and East walls OK pending MTI insp. tests and approvals. 3000 PSI design .
|