BLD-Final | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Dave Hannah
|
|
|
TJ Phone #: ###-####
|
FIRE-Final Inspection | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 10/31/2013 | 10/31/2013 | 11/1/2013 | P | NR |
Dave Hannah
|
|
|
TJ Wilcomb Phone #: ###-#### needs fire finals signed off first
|
BLD-Conference | 9/27/2013 | 10/1/2013 | 10/2/2013 | A | PEND |
Dave Hannah
|
|
|
10:30am please-John Sanchez Phone #: ###-#### ada sinks in restrooms
|
BLD-Other | 8/2/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Dave Hannah
|
|
|
soffit for exterior canopy - john Phone #: ###-####
|
BLD-Final | 7/26/2013 | 7/29/2013 | 7/30/2013 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok for temp occ needs to get other trades to pemp and fix ada restroom and finish ext and one handrail
|
FIRE-Final Inspection | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PART |
Forrest France
|
|
|
Final pending revised plan sheet for changes to the meeting rooms/hallway, missing exit discharge lighting, post signage at the fire riser and alarm panel rooms, project related fire alarm permit final also pending.
|
FIRE-Final Inspection | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | NR |
Forrest France
|
|
|
john - life safety Phone #: ###-####
|
BLD-Final | 7/25/2013 | 7/26/2013 | 7/26/2013 | P | NR |
Dave Hannah
|
|
|
john Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ceiling on west side
|
BLD-Other | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | PART |
Jim Sly
|
|
|
structural celing cover//John Phone #: ###-#### Framing for hard lid ceiling in Ext. patio area.....OK.
|
BLD-Ceiling Grid Inspection | 6/19/2013 | 6/20/2013 | 6/21/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ceilings with hard lids
|
BLD-Framing/Rough-in | 6/3/2013 | 6/4/2013 | 6/6/2013 | P | PASS |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ext walls
|
BLD-Framing/Rough-in | 5/29/2013 | 5/30/2013 | 6/4/2013 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover int walls
|
FIRE-Supply Line Cover | 5/23/2013 | 5/23/2013 | 5/23/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line okayed for cover
|
FIRE-Conference | 5/7/2013 | 5/8/2013 | 5/13/2013 | P | DONE |
Forrest France
|
|
|
On site conference regarding project schedule, fire sprinkler and alarm permit work.
|
BLD-Conference | 5/7/2013 | 5/8/2013 | 5/8/2013 | P | DONE |
Jim Sly
|
|
|
Johna Sanchez-at 2:30 please Phone #: ###-#### Met with contractor. OK'd the use of fiberglass insulation for fireblocking if installed properly..
|
BLD-Framing/Rough-in | 5/2/2013 | 5/3/2013 | 5/6/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to one side elec room
|
BLD-Framing/Rough-in | 3/26/2013 | 3/27/2013 | 3/28/2013 | A | PASS |
Dave Hannah
|
|
|
Roof inspection please-John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/19/2013 | 3/19/2013 | 3/21/2013 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### roof sheeting north half ok to cover after they finish edge nailing
|
BLD-Footing | 3/15/2013 | 3/18/2013 | 3/19/2013 | P | PASS |
Dave Hannah
|
|
|
john Phone #: ###-#### ADA ramp
|
BLD-Concrete | 3/11/2013 | 3/12/2013 | 3/12/2013 | P | PASS |
Dave Hannah
|
|
|
concrete slab- John Phone #: ###-####
|
BLD-Foundation | 3/4/2013 | 3/5/2013 | 3/5/2013 | A | PASS |
Dave Hannah
|
|
|
stem wall, pre column insp//john Phone #: ###-####
|
BLD-Footing | 2/26/2013 | 2/27/2013 | 2/27/2013 | A | PASS |
Dave Hannah
|
|
|
jon Phone #: ###-####
|