Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD12-03203
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 200 W BROAD ST
Project NameWILCOMB OFFICE BUILDING
Customer Number 
ePlanReviewYes
Description
(CSHQA ARCHITECTS - WILCOMB OFFICE BUILDING) (LEED PLATINUM) The fire sprinkler system is used for building area increase. To convert an existing warehouse building to an office building. The total floor area of this building is about 19,243 square feet. This building occupies the entire site. Work is to include interior nonbearing walls, 4 restrooms accessible to the disabled, 2 shower rooms accessible to the disabled, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, interior finishes, wall furring and insulation at exterior walls, a new thermoplastic single-ply roofing system installed over continuous roof insulation, closed cell polyurethane insulation installed below the roof deck in isolated locations, new exterior windows, new exterior doors, new acrylic skylights, interior doors, and a masonry parapet on top of an existing party wall. Structural work includes steel headers and columns at new exterior wall openings, parapets and parapet bracing, additional roof joists, and concrete retaining walls. The seismic upgrade includes wood structural panels installed on top of the existing roof deck, ties between the roof diaphragm and the exterior walls, and new concrete shear walls. Special Inspection is required for concrete, masonry, welding, and epoxy anchors. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/12/201311/13/201311/13/2013APASS
DetailsDave Hannah
TJ Phone #: ###-####
FIRE-Final Inspection11/5/201311/6/201311/6/2013APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/31/201310/31/201311/1/2013PNR
DetailsDave Hannah
TJ Wilcomb Phone #: ###-#### needs fire finals signed off first
BLD-Conference9/27/201310/1/201310/2/2013APEND
DetailsDave Hannah
10:30am please-John Sanchez Phone #: ###-#### ada sinks in restrooms
BLD-Other8/2/20138/5/20138/5/2013PPASS
DetailsDave Hannah
soffit for exterior canopy - john Phone #: ###-####
BLD-Final7/26/20137/29/20137/30/2013PPART
DetailsDave Hannah
john Phone #: ###-#### ok for temp occ needs to get other trades to pemp and fix ada restroom and finish ext and one handrail
FIRE-Final Inspection7/26/20137/29/20137/29/2013APART
DetailsForrest France
Final pending revised plan sheet for changes to the meeting rooms/hallway, missing exit discharge lighting, post signage at the fire riser and alarm panel rooms, project related fire alarm permit final also pending.
FIRE-Final Inspection7/25/20137/26/20137/26/2013ANR
DetailsForrest France
john - life safety Phone #: ###-####
BLD-Final7/25/20137/26/20137/26/2013PNR
DetailsDave Hannah
john Phone #: ###-####
BLD-Ceiling Grid Inspection7/23/20137/24/20137/24/2013APART
DetailsDave Hannah
john Phone #: ###-#### ok to cover ceiling on west side
BLD-Other7/12/20137/12/20137/12/2013PPART
DetailsJim Sly
structural celing cover//John Phone #: ###-####
Framing for hard lid ceiling in Ext. patio area.....OK.
BLD-Ceiling Grid Inspection6/19/20136/20/20136/21/2013APART
DetailsDave Hannah
john Phone #: ###-#### ok to cover ceilings with hard lids
BLD-Framing/Rough-in6/3/20136/4/20136/6/2013PPASS
DetailsDave Hannah
john Phone #: ###-#### ok to cover ext walls
BLD-Framing/Rough-in5/29/20135/30/20136/4/2013APART
DetailsDave Hannah
John Phone #: ###-#### ok to cover int walls
FIRE-Supply Line Cover5/23/20135/23/20135/23/2013APART
DetailsForrest France
UG fire supply line okayed for cover
FIRE-Conference5/7/20135/8/20135/13/2013PDONE
DetailsForrest France
On site conference regarding project schedule, fire sprinkler and alarm permit work.
BLD-Conference5/7/20135/8/20135/8/2013PDONE
DetailsJim Sly
Johna Sanchez-at 2:30 please Phone #: ###-####
Met with contractor. OK'd the use of fiberglass insulation for fireblocking if installed properly..
BLD-Framing/Rough-in5/2/20135/3/20135/6/2013APART
DetailsDave Hannah
john Phone #: ###-#### ok to one side elec room
BLD-Framing/Rough-in3/26/20133/27/20133/28/2013APASS
DetailsDave Hannah
Roof inspection please-John Phone #: ###-####
BLD-Framing/Rough-in3/19/20133/19/20133/21/2013PPART
DetailsDave Hannah
John Phone #: ###-#### roof sheeting north half ok to cover after they finish edge nailing
BLD-Footing3/15/20133/18/20133/19/2013PPASS
DetailsDave Hannah
john Phone #: ###-#### ADA ramp
BLD-Concrete3/11/20133/12/20133/12/2013PPASS
DetailsDave Hannah
concrete slab- John Phone #: ###-####
BLD-Foundation3/4/20133/5/20133/5/2013APASS
DetailsDave Hannah
stem wall, pre column insp//john Phone #: ###-####
BLD-Footing2/26/20132/27/20132/27/2013APASS
DetailsDave Hannah
jon Phone #: ###-####