Permit Information
Permit NumberBLD12-03211
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCapitol High - Hallway Remodel
Customer Number 
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL – Hallway Remodel – Sprinkler Upgrade) Permit is to remodel the existing hallways within the school and extend the sprinkler system to them. This building is partially fire sprinklered there is an informal upgrade agreement outline attached to BLD11-00450 to show the intent to have the building fully spinklered in phases over the next 5 years. Approval contingent upon adhering to the approved plans on file. Work to include: installation of a new suspended ceiling, new lighting / switching, new accessible doors / hardware, continuation of sprinkler and alarm system into hallways / gymnasium, and finishes in compliance with chapter 8 of the 2009 IBC. This building is partial Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20138/23/20138/23/2013PPASS
DetailsJim Sly
russ Phone #: ###-####
Sprinkler head in janitors room, Emerg. light in breezeway and smoke seal on stairway door.....OK Cert of Compliance issued.
DOC - Permit Finaled8/23/20138/23/20138/23/2013PPASS
DetailsJim Sly
FIRE-Final Inspection8/21/20138/22/20138/22/2013APASS
DetailsTroy Cobbley
Life safety passed. One fire door was having problems latching and was in the process of being repaired and one additional emergency light is needed in the second floor breezeway. These items were going to be shown to the building inspector.
BLD-Final8/21/20138/21/20138/21/2013PNR
DetailsJim Sly
russ please call 30 before going out Phone #: ###-####
Need Fire life, sprinkler and alarm finals.
BLD-Conference8/19/20138/20/20138/20/2013ADONE
DetailsJim Sly
Russ Phone #: ###-####
BLD-Ceiling Grid Inspection8/1/20138/2/20138/2/2013APART
DetailsMike Jordan
russ Phone #: ###-####. Ceiling grid at cafateria and shop corridor. Pending eelctrical rough in inspection.
BLD-Ceiling Grid Inspection7/26/20137/29/20137/29/2013APART
DetailsJim Sly
matt Phone #: ###-####
Main floor ceiling grid OK except Shop corridor and Cafeteria.
BLD-Framing/Rough-in7/22/20137/23/20137/23/2013APART
DetailsJim Sly
ceiling grid inspection 2nd floor-Russ Phone #: 871-094
2nd Flr ceiling grid....OK.
BLD-Framing/Rough-in7/8/20137/9/20137/9/2013APART
DetailsJim Sly
russ Phone #: ###-####
OK to cover covered (E. to W.) walkway.....Far North end of main Bldg. MTI inspected all welding.