Permit Information
Permit NumberBLD12-03261
StatusFinaled
Name BROWN BUILDING CO LLC
Site Address 1024 W PARKHILL DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 702s.f. to an existing 2989s.f. R-1B ok per Colleen Carroll. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason at 384-3946. Separate electrical, mechanical, plumbing and ESC permits are required. All per the approved plans as marked, energy proscriptive method, engineerindetails with calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20139/19/20139/19/2013PPASS
DetailsJim Sly
Matt Phone #: ###-####
DOC - Permit Finaled9/19/20139/19/20139/19/2013PPASS
DetailsJim Sly
BLD-Energy code compliance3/20/20133/20/20133/21/2013PPASS
DetailsTony Young
Matt Phone #: ###-####
BLD-Framing/Rough-in3/19/20133/19/20133/20/2013PPASS
DetailsTony Young
matt Phone #: ###-####
BLD-Framing/Rough-in3/18/20133/18/20133/19/2013PPART
DetailsTony Young
matt Phone #: ###-####,, need to verify seal package,, ok to start insulation,, will need egress out of front bedroom,, only new areas reviewed,, not the remodel area at this point
BLD-Wall Bracing3/6/20133/7/20133/7/2013APASS
DetailsTony Young
matt Phone #: ###-####,, exterior ok to cover
BLD-Footing2/6/20132/6/20132/6/2013PPART
DetailsTony Young
matt Phone #: ###-####,, wine celler footing off of existing basement ok
BLD-Foundation1/22/20131/22/20131/28/2013PPEND
DetailsTony Young
pete Phone #: ###-####
BLD-Foundation1/18/20131/18/20131/22/2013PPART
DetailsTony Young
pete Phone #: ###-####,, basement wall... heater and cover on site
BLD-Footing1/14/20131/15/20131/15/2013APART
DetailsTony Young
Pete Phone #: ###-####,, tented and heated now,, ok to pour basement footings,, will abide by ACI 360R
BLD-Footing1/11/20131/14/20131/14/2013APEND
DetailsTony Young
Pete Phone #: ###-####,, said the contractor will tent and heat hole,, re-scheduled for tues am
BLD-Footing1/11/20131/11/20131/14/2013PFAIL
DetailsTony Young
Pete Phone #: ###-####,, cold weather concrete provisions not provided for.. temps around 0 degrees at night..