BLD-Final | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PASS |
Mike Jordan
|
|
|
Ros has been approved.
|
BLD-Final | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | DEFR |
Jim Storey
|
|
|
Gayle Phone #: ###-#### pending ros aproval
|
FIRE-Final Inspection | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | FAIL |
Troy Cobbley
|
|
|
Life safety is passed but due to an outstanding ROS permit, per plan review, this permit can not be signed off.
|
FIRE-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | FAIL |
Forrest France
|
|
|
Provide fire sprinkler coverage at the "computer room" in the warehouse area-or remove ceiling, permit documents indicate no racking exceeding 8' in height allowed- provide a fire sprinkler system analysis and a racking permit for the intended use- or remove existing racking >8'.
|
BLD-Framing/Rough-in | 1/24/2013 | 1/24/2013 | 1/24/2013 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|