BLD-Final | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Wall Bracing | 9/24/2013 | 9/26/2013 | 9/27/2013 | P | PASS |
Tony Young
|
|
|
BOBBY Phone #: ###-####,, interior ok
|
BLD-Energy code compliance | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PASS |
Tom Arcoraci
|
|
|
bobby late morning Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Tom Arcoraci
|
|
|
Bobby Phone #: ###-####
|
BLD-Wall Bracing | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | PART |
Tony Young
|
|
|
bob - and soffit Phone #: ###-####,, exterior shear ok per ok from engineer allowing staples at 1/2 spacing,, soffits are work in progress,, ok.. will need interior shear later
|
BLD-Framing/Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PART |
Tony Young
|
|
|
Shear inspection please-Bobby Phone #: ###-####,, need full set of plans,, missing main level shear plan,, need ok from engineer of record on using staples,, need alternate hold down on front right of entry door,(existing is on the other side of the window,, ok to nail sheeting around windows to start the flashing and setting of windows
|
BLD-Wall Bracing | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | FAIL |
Jim Storey
|
|
|
Todd Phone #: ###-#### need to reprint city aproved set to be able to do insp.
|
BLD-Wall Bracing | 9/9/2013 | 9/10/2013 | 9/10/2013 | P | FAIL |
Tony Young
|
|
|
bob Phone #: ###-####,, NOT READY
|
BLD-Wall Bracing | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | NR |
Tony Young
|
|
|
bob Phone #: ###-####
|
BLD-Foundation | 7/11/2013 | 7/12/2013 | 7/12/2013 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 6/24/2013 | 6/24/2013 | 6/25/2013 | P | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####please call prior to inspection,, remainder of exterior house footings
|
BLD-Foundation | 5/21/2013 | 5/22/2013 | 5/22/2013 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-####,, walls on approved footings ok
|
BLD-Footing | 5/15/2013 | 5/15/2013 | 5/16/2013 | P | PART |
Tony Young
|
|
|
Joe-12:30 if possible as everyone will be there to meet with you Phone #: ###-####
|
BLD-Footing | 5/14/2013 | 5/15/2013 | 5/15/2013 | A | PART |
Tony Young
|
|
|
JOE Phone #: ###-####,, work in progress on areas from report
|
BLD-Footing | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | NR |
Tony Young
|
|
|
JOE Phone #: ###-####,, need soils subgrade approval,, on site visit
|