BLD-Final | 7/15/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Bob Archibald
|
|
|
inspection for temp CO // Jim (or Patrick ###-####) Phone #: ###-####. Ok for final occupancy.
|
FIRE-Final Inspection | 7/15/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Craig D. Hanson
|
|
|
due to rearragngement of door to back pedicure room, exit sign not needed from back hall. relocated sign to North side of collums.
|
BLD-Ceiling Grid Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### ok to cover ceilling
|
BLD-Framing/Rough-in | 6/9/2014 | 6/9/2014 | 6/9/2014 | P | PASS |
Dave Hannah
|
|
|
Jim-Ceiling tile inspection Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/2/2014 | 6/3/2014 | 6/3/2014 | A | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | NR |
Jim Storey
|
|
|
Jim-behive area Phone #: ###-####
|
BLD-Framing/Rough-in | 3/26/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Dave Hannah
|
|
|
ok to cover int walls
|
BLD-Energy code compliance | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 2/25/2014 | 2/26/2014 | 2/27/2014 | A | PASS |
Dave Hannah
|
|
|
per Bob check progress of work. No inspections have been scheduled work in progress
|