BLD-Final | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Storey
|
|
|
JC-final for perm c of o Phone #: ###-####
|
BLD-Conference | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PART |
Jim Storey
|
|
|
Gary Phone #: ###-#### temp ok
|
FIRE-Final Inspection | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Jim Page
|
|
|
Attached FIR permit to this BLD permit for sprinklers finaled, attached FIR permit to this BLD permit for alarms finaled. Life fire safety passed.complete
|
BLD-Final | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PART |
Jim Storey
|
|
|
Gary-wings F & G Phone #: ###-#### c/n with gary //doors latch ok all floors
|
FIRE-Final Inspection | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | CANC |
Thomas Walsh
|
|
|
Gary// Wings S and G Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Jim Storey
|
|
|
fire rated soffits; Gary Phone #: ###-#### ceillings ok to cover all floors
|
BLD-Framing/Rough-in | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Storey
|
|
|
Gary-soffits-1st floor F corridors Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Jim Storey
|
|
|
Gary// 2nd floor F Phone #: ###-####4th 3rd and 2nd ok
|
BLD-Other | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Jim Storey
|
|
|
T-grid soffits E 1st fl hallway - Jerry Phone #: ###-####2nd and third ok
|
BLD-Framing/Rough-in | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | PASS |
Jim Storey
|
|
|
Gary-hallway G on 1 st floor- basement elevator- lobby Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Jim Storey
|
|
|
2nd floor; Gary Phone #: ###-#### hard lids ok
|
BLD-Framing/Rough-in | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Jim Storey
|
|
|
G-3rd floor (Hall); Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Jim Storey
|
|
|
F first fl hallway - Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Jim Storey
|
|
|
2nd fl F hallway, cover - Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Jim Storey
|
|
|
Mark-east 1st floor corridor Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | FAIL |
Jim Storey
|
|
|
Garry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | NR |
Jim Storey
|
|
|
Garry Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/15/2015 | 7/16/2015 | 7/17/2015 | P | PASS |
Jim Storey
|
|
|
JC// F wing, 3rd floor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Jim Storey
|
|
|
Gary// 4th floor, hallway F Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2015 | 6/29/2015 | 6/29/2015 | A | PASS |
Jim Storey
|
|
|
G first floor sofet // Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 | P | NR |
Jim Storey
|
|
|
G first floor sofet // Gary Phone #: ###-####
|
BLD-Energy code compliance | 6/8/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Jim Storey
|
|
|
Gary Phone #: ###-####
|
BLD-Wall cover | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Jim Storey
|
|
|
Bldg F, first floor//fire caulking, ok to cover - Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | DEFR |
Jim Storey
|
|
|
Bldg F, first floor//fire caulking, ok to cover - Gary Phone #: ###-####
|
BLD-Other | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Jim Storey
|
|
|
Soffit; Gary Phone #: ###-####
|
BLD-Energy code compliance | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Jim Storey
|
|
|
Gary// F wing 1st and 2nd floor rooms 158 and 258 Phone #: ###-####
|
BLD-Energy code compliance | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PASS |
Jim Storey
|
|
|
F 2nd & 3rd floor - Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Jim Storey
|
|
|
Gary// 4th floor hallway F Phone #: ###-####
|
BLD-Other | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PASS |
Jim Storey
|
|
|
Gary// approval to cover soffits- 1st floor F Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Jim Storey
|
|
|
1st floor; Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Jim Storey
|
|
|
Gary-2nd floor G wing Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Jim Storey
|
|
|
Gary-2nd floor soffits wing F Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/22/2015 | 4/22/2015 | 4/23/2015 | P | PASS |
Jim Storey
|
|
|
1st and 2nd floor wing G.. To cover // gary Phone #: ###-####
|
BLD-Wall cover | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | PASS |
Jim Storey
|
|
|
third floor // Gary Phone #: ###-####
|
BLD-Energy code compliance | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | PASS |
Jim Storey
|
|
|
3 and 4 F wing // Gary Phone #: ###-####
|
BLD-Other | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Jim Storey
|
|
|
To cover // Gary Phone #: ###-#### 4th floor f ok to cover drops/ entry roof truss repairs ok to cover.
|
BLD-Energy code compliance | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Jim Storey
|
|
|
Gary// 1st, 2nd, & 3rd floor bldg. G Phone #: ###-####
|
BLD-Energy code compliance | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Jim Storey
|
|
|
Gary// 1st, 2nd, and 3rd floor wing G- air barrier insulation Phone #: ###-####
|
BLD-Energy code compliance | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Jim Storey
|
|
|
Gary//1st floor F wing Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | PASS |
Jim Storey
|
|
|
RCE... Second floor F // Dan Phone #: ###-####
|
BLD-Energy code compliance | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PASS |
Jim Storey
|
|
|
insulation // Gary Phone #: ###-####unit septration walls above ceilling/ corridor ok to pre gyp 3rd
|
BLD-Energy code compliance | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PASS |
Jim Storey
|
|
|
3rd fl wing f - Gary Phone #: ###-#### ceilling ok to cover
|
BLD-Other | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PASS |
Jim Storey
|
|
|
Gary// F wing- 2nd and 3rd floors-demising walls Phone #: ###-####
|
BLD-Wall Bracing | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Jim Storey
|
|
|
Gary-F wing 1,2,3,4,floor Phone #: ###-#### sheer naill ok pending rfi as to top plate or blk. top of sheathing.
|
BLD-Framing/Rough-in | 2/6/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Jim Storey
|
|
|
Garyf Bldg F Phone #: ###-#### coridor 4th floor ok
|
BLD-Other | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PASS |
Jim Storey
|
|
|
Gary// F wing-3rd floor- hallway- approval to insulate Phone #: ###-####
|
BLD-Wall Bracing | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PASS |
Jim Storey
|
|
|
JC-exterior shear g wing Phone #: ###-####
|