BLD-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Final | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### final ok pending plm
|
BLD-Final | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | NR |
Jim Storey
|
|
|
jc Phone #: ###-####
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | P | DONE |
Thomas Walsh
|
|
|
Final fire and life safety inspection for Bldg. J. Tested inreface with egress hardware (mag locks) to ensure proper functioning. Address (temp. sign) posted, pending arrival of permanent address. Fire extinguishers OK. Knox box awaiting permanent keys to building. NOTE: Address changed (from 4032 to 4016) for this building to that indicated on the permit.
|
FIRE-Final Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PART |
Thomas Walsh
|
|
|
Fire life-safety inspection for Bldg. J. Emergency lighting and exit sign test off of generator - OK Smoke doors installed and operational. Egress doors, with magnetic door locking hardware still being installed - not tested this visit. For final sign off, need to complete fire sprinklers and fire alarm finals, need building address posted, need one adiitional fire extinguisher near laundry room, and egress doors tested with fire alarm interface. Suggest that Boise Fire be contacted to lock building keys into Knox box, which is installed.
|
BLD-Ceiling Grid Inspection | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Jim Storey
|
|
|
Gary// Bldg. J Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2015 | 5/14/2015 | 5/14/2015 | P | PART |
Jim Storey
|
|
|
Sean Phone #: ###-#### damper patch at smoke septration 2 locations/ hvac damper 6 and 8 vents ?/2 collors 3 in pipe remove 2x4 and patch
|
BLD-Energy code compliance | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-#### spa area ok for cover bldg j
|
BLD-Energy code compliance | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | PART |
Jim Storey
|
|
|
Shawn-partial exterier walls in the skilled nursing room Phone #: ###-#### need windows insulated.
|
BLD-Energy code compliance | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Jim Storey
|
|
|
Shawn-inspection is for whole address Phone #: ###-####-call when you get there so Shawn can meet air seal ok
|
BLD-Energy code compliance | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | FAIL |
Dave Hannah
|
|
|
Sean Phone #: ###-#### not ready still working
|
BLD-Conference | 2/6/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Jim Storey
|
|
|
Shawn-whole building inspection for trusses bldg J-would like inspection after 10:00 Phone #: ###-#### ok to cover ceilling.
|
BLD-Framing/Rough-in | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PART |
Jim Storey
|
|
|
Shawn-framing in attic & smoke walls for SKilled Nursing bldg J Phone #: ###-#### truss uplift/ misc
|
BLD-Framing/Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Jim Storey
|
|
|
Sean-would like between10:00 and 11:30 if possible or pm-Skilled Nursing Bldg J-locations where they need to install showers Phone #: ###-####
|
BLD-Energy code compliance | 11/14/2014 | 11/17/2014 | 11/17/2014 | A | PART |
Jim Storey
|
|
|
shean Phone #: ###-#### ele rm and riser rm exterior walls
|
BLD-Framing/Rough-in | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | PART |
Jim Storey
|
|
|
Shawn-partial for cover on 5 walls in mechanical room-skilled nursing bldg J Phone #: ###-#### exterior walls at ele/plm wall pending plm aproval ok to insulste specific walls.
|
BLD-Wall Bracing | 9/11/2014 | 9/12/2014 | 9/15/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####425 wall sheer ok
|
BLD-Wall Bracing | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | DEFR |
Dave Hannah
|
|
|
JC Phone #: ###-#### resceduled for 8/12 out of time today
|
BLD-Footing | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PASS |
Jim Storey
|
|
|
j.c. Phone #: ###-####
|