Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-00294
StatusFinaled
Name CULPAN & COMPANY
Site Address 2434 E SUNSHINE DR
Project NameLickley Residence
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 3,726 sq. ft., two story (first story 1,703 sq. ft., second story 1,350 sq. ft.) single family dwelling with a 673 sq. ft. finished basement, 300 sq ft of deck, 4.5 bedrooms, 3.5 bathrooms, and a 1,607 sq. ft. attached garage per the approved plans, plan review report, attached engineering, and any notations. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201311/6/201311/6/2013APASS
DetailsMike Jordan
Jared Phone #: ###-####
DOC - Permit Finaled11/6/201311/6/201311/6/2013PPASS
DetailsMike Jordan
BLD-Final10/15/201310/16/201310/16/2013ANR
DetailsTom Arcoraci
Jarrod Phone #: ###-####
BLD-Energy code compliance7/2/20137/3/20137/3/2013APASS
DetailsDave Hannah
Jared Phone #: ###-####
BLD-Framing/Rough-in7/1/20137/2/20137/2/2013APASS
DetailsJim Sly
Patrick Phone #: ###-####
BLD-Framing/Rough-in6/27/20136/28/20136/28/2013AFAIL
DetailsTony Young
jared Phone #: ###-####,, correction posted,, do not insulate
BLD-Other6/6/20136/7/20136/7/2013APART
DetailsTony Young
fire rated soffits - Jarod Phone #: ###-####,, 1st layer ok
BLD-Wall Bracing5/31/20136/3/20136/3/2013APASS
DetailsTom Arcoraci
JAROD Phone #: ###-####
BLD-Foundation4/23/20134/24/20134/26/2013PPASS
DetailsDave Hannah
hyrum Phone #: ###-####
BLD-Footing4/22/20134/23/20134/23/2013APART
DetailsDave Hannah
2nd footing - Hyrun Phone #: ###-#### upper level forms up and horz bar in waiting for engioneer on vert splacing ok to place concrete
BLD-Foundation4/11/20134/12/20134/15/2013APART
DetailsDave Hannah
hyrum Phone #: ###-#### basement walls
BLD-Footing4/8/20134/9/20134/10/2013PPART
DetailsDave Hannah
hyrum Phone #: ###-#### basement ftgs ok