BLD-Final | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Jim Sly
|
|
|
Craig Phone #: ###-#### OK for perm occ.
|
BLD-Final | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | NR |
Jim Sly
|
|
|
Craig-please call to meet, would like later PM if possible Phone #: ###-#### Need public works
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | FAIL |
Jim Sly
|
|
|
Craig Phone #: ###-####// please call prior Need Public Works and ACHD finals.......Risers at 3 spiral stairs .....opening 4" or less.
|
FIRE-Final Inspection | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/1/2015 | 6/1/2015 | 6/3/2015 | P | FAIL |
Troy Cobbley
|
|
|
Still no approved plans on site and I need to verify the smoke alarm relocation and testing
|
FIRE-Conference | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | DONE |
Troy Cobbley
|
|
|
No city approved plans on site but I performed a conference anyway. I noted that the main building address is not visible from Ustick Rd, missing tagged fire extinguishes on lower and upper levels and that many of the smoke alarms are installed less than 3'-0" from bathrooms containing a tub or shower.
|
BLD-Conference | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | DONE |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Phil Shearer
|
|
|
Travis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2014 | 7/30/2014 | 7/30/2014 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2014 | 7/29/2014 | 7/29/2014 | P | NR |
Jim Sly
|
|
|
Travis-call prior to meet Phone #: ###-####
|
BLD-Conference | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | DONE |
Jim Sly
|
|
|
Travis Phone #: ###-#### Walk thru.....Firestopping.
|
BLD-Conference | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Wall Bracing | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### Exterior nailing and strapping only......OK. Need to complete all hold downs and anchor bolts at interior.
|
BLD-Conference | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | DONE |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Conference | 8/12/2013 | 8/13/2013 | 8/13/2013 | A | DONE |
Jim Sly
|
|
|
Travis phone ###-####
|
BLD-Conference | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | CANC |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Foundation | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PASS |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Footing | 5/17/2013 | 5/17/2013 | 5/20/2013 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|