BLD-Final | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/25/2014 | 3/25/2014 | 3/26/2014 | P | PASS |
Dave Hannah
|
|
|
rob Phone #: ###-####
|
BLD-Energy code compliance | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Dave Hannah
|
|
|
rob Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Dave Hannah
|
|
|
rob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | FAIL |
Mike Jordan
|
|
|
rob Phone #: ###-#### LATE PLEASE. Strap 4x4 to beam above at bottom of stairs, draftstop all furdowns and at fireplace, seal penetrations at draftstop on open web joist. Correction notice posted. Ok to insulate.
|
BLD-Other | 9/23/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Mike Jordan
|
|
|
Rob ... soffit and facia insp for WUI Phone #: ###-#### LATE PM IF POSSIBLE
|
BLD-Framing/Rough-in | 9/23/2013 | 9/23/2013 | 9/24/2013 | P | PART |
Dave Hannah
|
|
|
Late afternoon - Robert Phone #: ###-#### shear ok to cover ext walls.
|
BLD-Framing/Rough-in | 9/12/2013 | 9/13/2013 | 9/17/2013 | A | PART |
Dave Hannah
|
|
|
Rob Phone #: ###-#### shear needs to check stapel patterns
|
BLD-Other | 7/10/2013 | 7/11/2013 | 7/11/2013 | P | PASS |
Dave Hannah
|
|
|
flatwork//rob Phone #: ###-####
|
BLD-Foundation | 6/17/2013 | 6/18/2013 | 6/19/2013 | P | PART |
Dave Hannah
|
|
|
early - shawn Phone #: ###-#### rebar ok cerw is still setting forms
|
BLD-Footing | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PASS |
Dave Hannah
|
|
|
request early pm//Shawn Phone #: ###-####
|