Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-00550
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 531 S PINE ISLAND LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1471 sq. ft., two story (first story 638 sq. ft., second story 833 sq. ft.) single family dwelling with 3 bedrooms, 2 1/2 bathrooms, approximately 55 sq. ft. of covered patio/porch and a 425 sq. ft. attached garage per the approved plans, attached engineering, plan review report and any notations. R-2D zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20141/31/20141/31/2014APASS
DetailsMike Jordan
Call brian 30 minutes before inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
DOC - Permit Finaled1/31/20141/31/20141/31/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/31/20141/31/20141/31/2014PDONE
DetailsMike Jordan
4.0
BLD-Final1/28/20141/29/20141/29/2014ANR
DetailsMike Jordan
Call Brian 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover11/5/201311/5/201311/5/2013PCANC
DetailsMike Jordan
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. No assembly on this unit.
BLD-Wall cover11/1/201311/4/201311/4/2013ANR
DetailsMike Jordan
Interior firewall fastening Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Energy code compliance10/25/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/28/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/21/201310/22/201310/22/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Provide truss engineering. Ok to insulate after mech. rough in inspection.
BLD-Wall Bracing8/20/20138/20/20138/20/2013APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing8/9/20138/9/20138/9/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing7/26/20137/26/20137/26/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing7/8/20137/8/20137/8/2013PPASS
DetailsMike Jordan
BLD-Footing7/3/20137/8/20137/8/2013ANR
DetailsMike Jordan
Greg Phone #: ###-####
BLD-Foundation6/24/20136/24/20136/24/2013PPASS
DetailsJim Sly
BLD-Footing6/24/20136/24/20136/24/2013PPASS
DetailsJim Sly
BLD-Energy code compliance6/24/20136/24/20136/24/2013PPASS
DetailsMike Jordan
greg Phone #: ###-####. Rigid foam insulation, under slab on grade, interior side of stemwall.