Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-00551
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 579 S PINE ISLAND LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1471 sq. ft., two story (first story 638 sq. ft., second story 833 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 50 sq. ft. of covered patio/porch and a 425 sq. ft. attached garage per the approved plans, attached engineering, plan review report and any notations. R-2D zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/3/20141/6/20141/6/2014APASS
DetailsMike Jordan
Call Brah Phone #: ###-#### >> Inspection requested via web by James Larkin
DOC - Permit Finaled1/6/20141/6/20141/6/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/6/20141/6/20141/6/2014ADONE
DetailsMike Jordan
3
BLD-Wall cover10/21/201310/21/201310/21/2013PPASS
DetailsMike Jordan
Call brian prior to inspection. For interior sheetrock fastener schedule. Phone #: ###-#### >> Inspection requested via web by Brian . 1hr. wall, interior side ok.
BLD-Energy code compliance10/10/201310/11/201310/11/2013APASS
DetailsMike Jordan
Contact Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Framing/Rough-in10/8/201310/9/201310/9/2013ACANC
DetailsMike Jordan
Call 30 minutes prior to inspection. Thanks. Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Framing/Rough-in10/8/201310/9/201310/9/2013APASS
DetailsMike Jordan
Call 30 minutes prior to inspection. Thanks. Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing8/1/20138/1/20138/1/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing7/2/20137/3/20137/3/2013PPASS
DetailsMike Jordan
Greg Phone #: ###-#### nterior thickened footing.
BLD-Energy code compliance6/24/20136/24/20136/24/2013PPASS
DetailsMike Jordan
Rigid foam insulation, under slab on grade, interior side of stemwall.
BLD-Foundation6/18/20136/19/20136/19/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing6/18/20136/18/20136/18/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron