Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-00557
StatusFinaled
Name CULPAN & COMPANY
Site Address 2681 E MESA VERDE CT
Project NameMesa Verde
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 4469 sq. ft., tri-level (first level 1444 sq. ft., second level 1650 sq. ft., third level 1378 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, and a 1038 sq. ft. attached garage per the approved plans, attached engineering, attached revised engineering, attached approval for eve vents, attached ES Report for tile roofing, Res Check, plan review report and any notations. R-1A/DA zoning and setbacks per planning. AJS
No Fire Sprinklers Required. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/10/20147/11/20147/11/2014PPASS
DetailsDave Hannah
Clyde-coming in AM to take care of bond Phone #: ###-####
DOC - Permit Finaled7/11/20147/11/20147/11/2014PPASS
DetailsDave Hannah
BLD-Final7/3/20147/7/20147/7/2014ANR
DetailsDave Hannah
Clive Phone #: ###-#### needs hill side finaled
BLD-Final6/18/20146/19/20146/19/2014AFAIL
DetailsJim Storey
clive Phone #: ###-#### handrails atreem and upper roof deck
BLD-Energy code compliance11/8/201311/12/201311/12/2013APASS
DetailsJim Storey
jared Phone #: ###-####
BLD-Framing/Rough-in11/6/201311/7/201311/7/2013APASS
DetailsJim Storey
Jared Phone #: ###-####
BLD-Framing/Rough-in11/4/201311/5/201311/5/2013PNR
DetailsJim Storey
Jared Phone #: ###-#### need truss engineering
BLD-Framing/Rough-in10/24/201310/25/201310/25/2013AFAIL
DetailsJim Storey
sheet rock in the sofits-Jared Phone #: ###-#### gyp ok need all canlights to be protected
BLD-Wall Bracing10/14/201310/15/201310/15/2013APASS
DetailsDave Hannah
jared Phone #: ###-####
BLD-Wall Bracing10/9/201310/10/201310/10/2013APART
DetailsTom Arcoraci
Jared Phone #: ###-#### fire places need hds other ok
BLD-Wall Bracing9/9/20139/10/20139/10/2013AFAIL
DetailsDave Hannah
jarrod Phone #: ###-#### install hold downs and stapel/nail per engineering
BLD-Conference9/3/20139/4/20139/4/2013PDONE
DetailsDave Hannah
jared Phone #: ###-####
BLD-Foundation5/15/20135/16/20135/16/2013PPASS
DetailsDave Hannah
hyrum Phone #: ###-####
BLD-Footing5/9/20135/10/20135/10/2013APASS
DetailsJim Sly
hyrum Phone #: ###-####