Permit Information
Permit NumberBLD13-00595
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1200
Project Name8th & Main Ste# 1200
Customer Number 
ePlanReviewYes
Description
(DB FITZPATRICK & COMPANY INC – 8th & Main Building – Suite # 1200) This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time a 3,942 square foot office space on the 11,250 square foot 12th floor (Shell and Core done under BLD12-01991). Work is to include: [construction of interior none bearing walls to create; a waiting / reception room, a 570 square foot conference room, 6 individual offices, an open office area, a file storage area, a copy/print room, two storage closets, and a break room], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20141/24/20141/24/2014PPASS
DetailsDave Hannah
Final inspection of 12th floor TI and corridor, DB Fitzpatrick. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final1/21/20141/22/20141/22/2014ANR
DetailsDave Hannah
Request for Building Final, DB Fitzpatrick, 12th Floor. Thanks. Adam. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/21/20141/21/20141/21/2014PPASS
DetailsCraig D. Hanson
life safety pass
BLD-Ceiling Grid Inspection1/20/20141/21/20141/21/2014PPASS
DetailsJim Sly
Ceiling grid inspection of added corridor extension, DB Fitz, 12th floor, requested by Bob L. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Grid OK.
BLD-Conference10/3/201310/4/201310/7/2013APASS
DetailsDave Hannah
Conformation of FP at perimeter columns, follow up from yesterday. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/2/201310/3/201310/7/2013APASS
DetailsDave Hannah
Framing Inspection. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/1/201310/1/201310/7/2013PPASS
DetailsDave Hannah
DB Fitzpatrick, 12th Floor Framing. Thanks, Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference10/1/201310/1/201310/1/2013PCANC
DetailsDave Hannah
DB Fitzpatrick, 12th Floor Framing. Thanks, Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson