BLD-Final | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Dave Hannah
|
|
|
Final inspection of 12th floor TI and corridor, DB Fitzpatrick. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | NR |
Dave Hannah
|
|
|
Request for Building Final, DB Fitzpatrick, 12th Floor. Thanks. Adam. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Craig D. Hanson
|
|
|
life safety pass
|
BLD-Ceiling Grid Inspection | 1/20/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Jim Sly
|
|
|
Ceiling grid inspection of added corridor extension, DB Fitz, 12th floor, requested by Bob L. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Grid OK.
|
BLD-Conference | 10/3/2013 | 10/4/2013 | 10/7/2013 | A | PASS |
Dave Hannah
|
|
|
Conformation of FP at perimeter columns, follow up from yesterday. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/2/2013 | 10/3/2013 | 10/7/2013 | A | PASS |
Dave Hannah
|
|
|
Framing Inspection. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/1/2013 | 10/1/2013 | 10/7/2013 | P | PASS |
Dave Hannah
|
|
|
DB Fitzpatrick, 12th Floor Framing. Thanks, Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | CANC |
Dave Hannah
|
|
|
DB Fitzpatrick, 12th Floor Framing. Thanks, Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson
|