Permit Information
Permit NumberBLD13-00689
StatusFinaled
Name STEED CONSTRUCTION
Site Address 601 W GOWEN RD
Project NameWestern Power Sports Office Ad
Customer Number 
ePlanReviewYes
Description
Western Power Sports (Office Addition) – To construct a 21,725 square foot, steel framed, two story office addition on the northeast corner of an existing 155,565 square foot office warehouse distribution facility. The sprinklers are used for unlimited area increase. This permit also includes related site improvements. All constuction per the approved plans and attached comment list. JCM This building is fully fire sprinklered with and approved manual fire alarm system. Separate fire sprinkler and fire alarm permits will be required, as regulated by the Boise Fire Department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsJim Storey
Odie Phone #: ###-####
BLD-Final9/16/20149/17/20149/17/2014ANR
DetailsJim Storey
Odie Phone #: ###-####
FIRE-Final Inspection9/15/20149/16/20149/16/2014PPASS
DetailsForrest France
C/N items completed. Fire life safety passed inspection.
FIRE-Final Inspection9/3/20149/4/20149/4/2014ANR
DetailsForrest France
Fire life safety final pending project related FIR13-00308.
FIRE-Final Inspection8/12/20148/15/20148/19/2014APART
DetailsForrest France
Odie Phone #: ###-####-please give as much notice as possible so he can meet
BLD-Framing/Rough-in6/23/20146/24/20146/24/2014APASS
DetailsJim Storey
Odie Phone #: ###-####
FIRE-Conference5/27/20145/27/20145/27/2014PDONE
DetailsForrest France
Regarding floorplan modifications at the new and existing office areas 1st and 2nd floor.
BLD-Framing/Rough-in5/13/20145/14/20145/14/2014APASS
DetailsJim Storey
Odie Phone #: ###-####
BLD-Final4/17/20144/18/20144/18/2014AFAIL
DetailsJim Storey
Bodie-temp occupancy Phone #: ###-#### door 128 must meet exit door 1008
FIRE-Final Inspection4/16/20144/17/20144/17/2014APART
DetailsForrest France
Inspection completed for the new office area addition 1st and 2nd floors. Noted adjustments necessary to exit signage and fire sprinkler coverage. Also completed functional fire alarm testing including occupant notification.
BLD-Framing/Rough-in12/23/201312/23/201312/23/2013PPART
DetailsJim Storey
Ceiling insepction--Odie Phone #: ###-#### pending others/ vapor barrior at exterior wall at stair.
BLD-Framing/Rough-in9/16/20139/17/20139/17/2013PPASS
DetailsJim Storey
odie Phone #: ###-#### east exterior wal ok/ interior ok for backing material
BLD-Framing/Rough-in9/9/20139/10/20139/10/2013APART
DetailsJim Storey
ernie Phone #: ###-#### exterior walls ok
BLD-Framing/Rough-in8/22/20138/23/20138/23/2013APART
DetailsJim Storey
odie Phone #: ###-#### grid 7 exterior wall ok to cover
BLD-Conference7/10/20137/10/20137/10/2013APART
DetailsJim Storey
ft and wall performed with si pending reports. contractorto call in for inspection with si requist. si to e-mail reports to 301.