BLD-Final | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Dave Hannah
|
|
|
Final Building walk of TI and exit corridor. PM inspection, First American Title, 9th Floor. Thanks AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | NR |
Dave Hannah
|
|
|
Request for building final, 9th Floor, First American Title. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Craig D. Hanson
|
|
|
Pass, good
|
BLD-Conference | 1/3/2014 | 1/3/2014 | 1/6/2014 | P | PASS |
Dave Hannah
|
|
|
Request conference with Dave H. On site w/Bob Ledford, PM, ESI field office. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/3/2013 | 10/4/2013 | 10/7/2013 | A | PEND |
Dave Hannah
|
|
|
Follow up on yesterdays FP conformation walk at perimeter. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson still needs brace welded column 6d
|
BLD-Framing/Rough-in | 10/2/2013 | 10/3/2013 | 10/7/2013 | A | PEND |
Dave Hannah
|
|
|
Recap Framing from yesterday. Thanks, Adam. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/1/2013 | 10/1/2013 | 10/7/2013 | P | PART |
Dave Hannah
|
|
|
First American Title - Framing Inspection. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls all but for coulmn grid 6d
|
BLD-Framing/Rough-in | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### ok after other trades pass rough ins
|