BLD-Final | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Dave Hannah
|
|
|
nancy Phone #: ###-####
|
FIRE-Final Inspection | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety passed pending items discussed to be finished prior to structural final including; adjustment to the opening force at the south set of double doors, replace missing access panel, general housekeeping items. Any modifications to the hood suppression system will require a permit if the cook line appliances are changed.
|
BLD-Final | 9/4/2013 | 9/5/2013 | 9/5/2013 | A | CANC |
Dave Hannah
|
|
|
nancy -this inspection for occupancy Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 9/4/2013 | 9/4/2013 | 9/5/2013 | P | FAIL |
Forrest France
|
|
|
C/N items include; repair non-functional exit signs and EM lights, post max. occupant load signage, provide access to the locked office room for inspection, replace missing ceiling tile and access panel at the janitors closet, post K class PFE as discussed.
|