BLD-Final | 1/16/2014 | 1/17/2014 | 1/22/2014 | A | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Per Craig, life safety passed
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Per Craig, the life safety passed
|
BLD-Ceiling Grid Inspection | 1/8/2014 | 1/8/2014 | 1/9/2014 | P | PASS |
Dave Hannah
|
|
|
Request for Zions First Floor Ceiling Grid inspection, requested by Roger. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | PASS |
Dave Hannah
|
|
|
1st Floor, Zions Bank, Soffit request for cover per Roger Wilson, Thanks. akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/1/2013 | 11/4/2013 | 11/5/2013 | A | PART |
Dave Hannah
|
|
|
1st Floor Zions Bank, Framing inspection for cover, Scheduled per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls and soffits they will remove elec out of back side of exit passageway.
|
BLD-Framing/Rough-in | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | PART |
Dave Hannah
|
|
|
Zions First Floor Restroom Framing/Cover Inspection Request, Per Roger Wilson. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover back restrooms and brack area
|