(ZION'S BANK - SUITE 700 - 7TH FLOOR - BANK OFFICES) The fire sprinkler system used for high-rise. To construct a 16,902 square foot office tenant space located on the 7th story of a high-rise building. The drawings are filed under permit BLD13-00889. These drawings also include work to be done under permits BLD13-00889 (1st story) and BLD13-00904 (17th story). Work is to include interior nonbearing walls, interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board ceiling soffits, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20141/17/20141/22/2014APASS
DetailsDave Hannah
adam Phone #: ###-####
FIRE-Final Inspection1/16/20141/17/20141/17/2014APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final1/16/20141/16/20141/16/2014PNR
DetailsJim Sly
Building final 7th floor with Roger. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Need fire life safety final.
FIRE-Final Inspection1/16/20141/16/20141/16/2014PPART
DetailsForrest France
Final pending exit signage per plan review notes and comments.
BLD-Final1/14/20141/15/20141/16/2014PNR
DetailsDave Hannah
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/14/20141/14/20141/15/2014PNR
DetailsForrest France
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/14/20141/15/20141/15/2014APART
DetailsForrest France
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final1/14/20141/14/20141/14/2014PDEFR
DetailsTony Young
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection11/14/201311/15/201311/15/2013APASS
DetailsDave Hannah
Ceiling Grid inspection 7th Floor Zions, Exterior perimeter, previously inspected, just called in for formal sign off. AKJ Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/1/20138/2/20138/2/2013APASS
DetailsDave Hannah
tyler Phone #: ###-####