BLD-Final | 1/16/2014 | 1/17/2014 | 1/22/2014 | A | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | NR |
Jim Sly
|
|
|
Building final 7th floor with Roger. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Need fire life safety final.
|
FIRE-Final Inspection | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Forrest France
|
|
|
Final pending exit signage per plan review notes and comments.
|
BLD-Final | 1/14/2014 | 1/15/2014 | 1/16/2014 | P | NR |
Dave Hannah
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/14/2014 | 1/14/2014 | 1/15/2014 | P | NR |
Forrest France
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PART |
Forrest France
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | DEFR |
Tony Young
|
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Dave Hannah
|
|
|
Ceiling Grid inspection 7th Floor Zions, Exterior perimeter, previously inspected, just called in for formal sign off. AKJ Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | PASS |
Dave Hannah
|
|
|
tyler Phone #: ###-####
|