Information based on query as of Sunday, June 16, 2024.
Permit Information
Permit NumberBLD13-00938
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1109 W MAIN ST
Project NameOWYHEE PLACE
Customer Number 
ePlanReviewNo
Description
(OWYHEE PLACE - APARTMENTS, MEETING ROOM CORE, AND OFFICE CORE) (11-22-13 PLAN MODIFICATION TO CHANGE THE PROPOSED EXTENSIONS ON NEW HANDRAILS, TO RETAIN THE WEST RAMP AND STAIRWAY THAT SERVE THE 1ST STORY OF THE HISTORIC PORTION OF THIS BUILDING AND NOT INSTALL A WHEELCHAIR LIFT, TO RECONFIGURE AN EXISTING OPEN STAIRWAY THAT CONNECTS THE 1ST AND 2ND STORY LOCATED IN THE WEST END OF THE HISTORIC PORTION OF THIS BUILDING AND NOT INSTALL AN ENTIRELY NEW STAIRWAY, TO RETAIN AN INTERIOR SHEAR WALL AND NOT CONSTRUCT A NEW SHEAR WALL THAT WAS INTENDED TO PROVIDE EQUIVALENT CAPACITY, AND TO INSTALL AN INTERIOR FOLDING GLASS PARTITION ON THE 1ST STORY.) (11-4-13 PLAN MODIFICATION TO DELETE A PREVIOUSLY PROPOSED ROOF POP-UP AT THE 7TH STORY, INSTALL ADDITIONAL WINDOWS IN THE SOUTH EXTERIOR WALL OF THE 7TH STORY, RAISE THE CEILING OF THE 7TH STORY TO CREATE MORE ROOM VOLUME, TO REPLACE EXISTING HISTORIC EXTERIOR WINDOWS IN THE SOUTH AND WEST EXTERIOR WALLS OF THIS BUILDING WITH NEW WINDOWS, AND TO MODIFY THE DESIGN OF THE WALKWAY ACROSS THE ROOF GIVING ACCESS TO THE 2ND EXIT FROM THE 7TH STORY.) Fire sprinkler system used for area, story, and height increase. To renovate an existing 7 story building. Interior non-structural demolition work was done under permit BLD13-01010. On August 23, a plan modification was done to the demolition permit to include the removal of exterior nonstructural veneer brick on the Main Street and 11th Street sides of the historic portion of this building at the 1st story and to include the removal of the fire escape from the South exterior wall of the historic portion of this building. Early start permit BLD13-01955 was also issued. A portion of this building is historic and other portions are NOT historic. The 2nd, 3rd, and 4th stories of the non-historic former West hotel wing will be converted to 36 rental apartments (total occupant load of 130). This permit is intended to establish a Certificate of Occupancy for the new apartments. Alterations to the West apartment wing are regulated by the energy code. This permit does not establish a Certificate of Occupancy for any other portion of the building. Core work will also be done under this permit within the 7 story historic portion of this building. Alterations to the historic portion of this building are not regulated by the energy code. Certificate of Occupancies will be established for tenants located within the historic portion of this building, including the 7th story terrace, under future separate tenant improvement permits. Within the historic portion, new restrooms will be provided on the 1st story and on the 2nd story. Assembly rooms on the 2nd story will be expanded or combined. Egress will be upgraded on all stories. Trellis structures at grade will be constructed. New storefront windows will be installed at grade. Several other windows will also be replaced. Core areas on the 3rd, 4th, 5th, and 6th stories will be remodeled with new restrooms created. A new mechanical shaft will be constructed. The vault below the Main Street sidewalk will be abandoned. The sidewalk will be demolished, a retaining wall will be constructed below and parallel with the North exterior building wall, and the vault will be backfilled with structural fill. Special Inspection is required for concrete, masonry, welding, and epoxy anchors. This building will be connected to the downtown geothermal system. The fire sprinkler system shall comply with NFPA 13 and the fire alarm system shall comply with NFPA 72 as new systems and as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/22/20149/23/20149/23/2014PPASS
DetailsDave Hannah
Duel Phone #: ###-####
FIRE-Final Inspection9/23/20149/23/20149/23/2014PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection9/8/20149/8/20149/8/2014 PEND
DetailsDave Hannah
FIRE-Final Inspection7/8/20147/10/20147/11/2014APART
DetailsForrest France
2nd floor core area passed fire life safety inspection.
BLD-Final7/3/20147/3/20147/7/2014PPART
DetailsDave Hannah
Jim Phone #: ###-####
FIRE-Final Inspection7/3/20147/3/20147/3/2014PPART
DetailsForrest France
Completed re-inspection for previous correction items dated 6/30 related to apartments on the 2nd, 3rd and 4th floors. Provisions and adjustments finished with the exception of door closure at 212, exit discharge light at the main street side, outside waterflow bell not yet installed. Shell fire protection 1st floor pending necessary revisions per agreement on record. Temporary occupancy approved per R. Gervais.
FIRE-Final Inspection6/26/20146/30/20147/1/2014PFAIL
DetailsForrest France
Fire life safety inspection items for the 2nd, 3rd and 4th floor apartments completed 6/30 include; provide exit sign per plan review red line at the 1st floor landing east side stairway, install exit discharge lighting for both east and west stairways, test EM light 1st floor east stairway, remove scafolding in the west stairway, remove tape covering smoke alarms at 4th floor apartment units, install door seals at doors serving elevator lobbies to apt unit corridors, adjust closer at units 204, 206, 212. Remove tape and provide escutcheon at sprinkler head unit 206, provide intermediate temp pendent head at unit 312 adjacent to HVAC diffuser, install outside waterflow bell 11th street side, relocate two smoke alarms at unit 301, replace malfunctional flow switches at the 3rd and 4th floor sprinkler control manifolds. 1st floor fire sprinkler protection at the vacant shell does not meet NFPA 13 standards.
BLD-Final6/26/20146/30/20146/30/2014PNR
DetailsDave Hannah
apartments only - Jim Phone #: ###-####
BLD-Ceiling Grid Inspection6/26/20146/26/20146/26/2014PPASS
DetailsDave Hannah
2nd fl corridor bridal - Jim Phone #: ###-####
BLD-Ceiling Grid Inspection6/25/20146/25/20146/25/2014PPASS
DetailsDave Hannah
2nd fl ballroom - Jim Phone #: ###-####
BLD-Framing/Rough-in6/24/20146/24/20146/24/2014PPASS
DetailsDave Hannah
West side apart fire escape - Jim Phone #: ###-####
BLD-Conference6/23/20146/24/20146/24/2014APASS
DetailsDave Hannah
Jim Phone #: ###-####
BLD-Framing/Rough-in6/18/20146/18/20146/18/2014PPART
DetailsJim Sly
Ceiling grid inspection in the basement please-Jim Phone #: ###-####
Bsmnt elevator lobby and Board room.....OK.
BLD-Conference6/16/20146/17/20146/17/2014APASS
DetailsJim Storey
Jim Phone #: ###-#### entry vestabule ceilling ok to cover
BLD-Conference6/11/20146/11/20146/12/2014PPASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Framing/Rough-in6/10/20146/10/20146/11/2014PDEFR
DetailsDave Hannah
shaft wall inspection please-Jim Phone #: ###-#### called in wrong permit number
BLD-Other5/30/20146/6/20146/6/2014ACANC
DetailsDave Hannah
Foam barrier - Nabi Phone #: ###-####
BLD-Conference6/5/20146/5/20146/6/2014PDONE
DetailsDave Hannah
Jim Phone #: ###-#### rise and run of stairs and handrails
BLD-Conference5/30/20146/2/20146/2/2014APASS
DetailsDave Hannah
hand rail for core stairwell - Jim Phone #: ###-#### I have walked stair tower #2 and because of egress widths I have approved the handrails as they are currently built.
BLD-Conference5/22/20145/23/20145/27/2014APASS
DetailsDave Hannah
*Requests around 10 - Jim Phone #: ###-####
BLD-Ceiling Grid Inspection5/14/20145/15/20145/15/2014ANR
DetailsJim Storey
Jim-2nd floor core Phone #: ###-####
BLD-Framing/Rough-in5/9/20145/12/20145/12/2014APASS
DetailsDave Hannah
Juron Phone #: ###-####
BLD-Other5/6/20145/6/20145/6/2014PPASS
DetailsDave Hannah
1st fl cover/walk/ceiling - Jim Phone #: ###-####
BLD-Framing/Rough-in5/2/20145/2/20145/6/2014PPASS
DetailsDave Hannah
Jim-cover inspections for 1st and 2nd floors Phone #: ###-####
BLD-Conference4/30/20145/1/20145/1/2014ACANC
DetailsMike Jordan
jim - 11am please Phone #: ###-####. Cancelled, rescheduled for friday in the am.
BLD-Other4/24/20144/25/20144/29/2014APART
DetailsDave Hannah
jim - ceiling assembly on 1st floor Phone #: ###-#### hardlid first floor . rest rooms on the second/mezz deck ok to cover also ok to one side int walls on second /mezz deck ceiling grid in halls on 4 and 3 ok to cover
BLD-Framing/Rough-in4/21/20144/22/20144/23/2014APASS
DetailsDave Hannah
2nd fl restrooms & basement data room - Jim Phone #: ###-####
BLD-Other4/18/20144/18/20144/21/2014PPART
DetailsDave Hannah
jim - shaft inspection Phone #: ###-####
BLD-Other4/10/20144/10/20144/11/2014PNR
DetailsDave Hannah
fire stop - 2nd floor core Phone #: ###-####
BLD-Other4/9/20144/9/20144/9/2014PPART
DetailsDave Hannah
Fire stop - Jim Phone #: ###-#### first floor mailbox area ok to cover
BLD-Other4/3/20144/3/20144/4/2014PPART
DetailsDave Hannah
Mechanical shaft inspection please-Jason Phone #: ###-#### ok to cover
BLD-Other3/25/20143/25/20143/25/2014PPART
DetailsDave Hannah
Shaft inspection in the core pleaseJIm Phone #: ###-#### ok to start framing and installing ent layer of shaft wall board
BLD-Framing/Rough-in3/21/20143/21/20143/24/2014PPASS
DetailsDave Hannah
Ceiling cover inspection for the apt lobby please-Jim Phone #: ###-####
BLD-Conference3/17/20143/17/20143/18/2014PPASS
DetailsDave Hannah
Jim Phone #: ###-####
BLD-Conference3/18/20143/18/20143/18/2014PPASS
DetailsDave Hannah
Jim - Conf at 11 Phone #: ###-####
BLD-Other3/11/20143/12/20143/12/2014AFAIL
DetailsJim Storey
late AM// cover insp for apartment lobby / Jim Phone #: ###-#### oversized pvc penatration/ mail box area shaft required/ 1 ht protection of wood floor support/ west window gyp at ceilling line 1 hr protection behind metal framing.
BLD-Concrete3/3/20143/4/20143/4/2014APART
DetailsDave Hannah
jim - 6th fl shaft; 3th fl bath room; Phone #: ###-#### bath room ok need to finish framing shaft and install shaft board
BLD-Other2/25/20142/26/20142/27/2014ANR
DetailsDave Hannah
ceiling, elevator and stair tower core // Jim Phone #: ###-####
BLD-Other2/24/20142/24/20142/25/2014PPART
DetailsDave Hannah
core shaft - Jim Phone #: ###-#### ok to keep working on shaft they have the back wall in
BLD-Other2/18/20142/18/20142/18/2014PPART
DetailsDave Hannah
JIM - SHAFT LINER 6TH FL Phone #: ###-#### ok to keep going
BLD-Wall cover2/11/20142/12/20142/12/2014APASS
DetailsDave Hannah
apt corridor 2nd floor cover insp // Jim Phone #: ###-####
BLD-Other2/6/20142/7/20142/7/2014APASS
DetailsTony Young
2nd fl soffit cover - Jim Phone #: ###-####
BLD-Other2/5/20142/5/20142/6/2014PPEND
DetailsDave Hannah
reinsp soffit on 2nd floor for cover // Jim Phone #: ###-#### ok after fire oks
BLD-Other2/3/20142/3/20142/4/2014PNR
DetailsDave Hannah
jim Phone #: ###-####
BLD-Wall cover1/30/20141/31/20141/31/2014APASS
DetailsDave Hannah
4th floor restrooms please-Jim Phone #: ###-####
BLD-Other1/28/20141/28/20141/28/2014PNR
DetailsDave Hannah
JIM - FIRE PROOFING ON THE 4TH FLOOR Phone #: ###-####
BLD-Other1/10/20141/13/20141/14/2014ACANC
DetailsDave Hannah
2nd & 5th floor caulking - Jim Phone #: ###-####
Dave told me to cancel.....Already looked at it.
BLD-Framing/Rough-in1/13/20141/13/20141/14/2014PPART
DetailsDave Hannah
2nd & 5th floor caulking - Jim Phone #: ###-#### ok to cover 2nd floor aprt and 5th floor restrooms
BLD-Ceiling Grid Inspection1/7/20141/8/20141/9/2014APART
DetailsDave Hannah
JIM apt first floor Phone #: ###-#### needs to finish fire spray on rock wool floor infills
BLD-Other1/3/20141/6/20141/7/2014PPASS
DetailsDave Hannah
jim - 3rd floor apts - fire stop Phone #: ###-####
BLD-Other1/7/20141/7/20141/7/2014APART
DetailsDave Hannah
jim - 3rd floor apts - fire stop Phone #: ###-#### ok to cover walls on 3rd floor
BLD-Other12/24/201312/27/201312/27/2013APASS
DetailsDave Hannah
jim - cover on 3rd floor apartments Phone #: ###-####
BLD-Framing/Rough-in12/19/201312/20/201312/21/2013PNR
DetailsDave Hannah
Ok to cover 3rd fl apart - Jim Phone #: ###-####
FIRE-Conference12/11/201312/11/201312/11/2013PDEFR
DetailsForrest France
tim - fire walk 2:30 if possible Phone #: ###-####
BLD-Framing/Rough-in12/5/201312/5/201312/9/2013PPASS
DetailsDave Hannah
3RD FLOOR - FRAMING AND FIRE PROOFING PER DAVE HANNAH
BLD-Other12/4/201312/5/201312/9/2013ANR
DetailsDave Hannah
jim - 7 to 1 floor Phone #: ###-####
FIRE-Final Inspection12/9/201312/9/201312/9/2013PNR
DetailsForrest France
Jim Phone #: ###-####
FIRE-Final Inspection12/4/201312/5/201312/5/2013ANR
DetailsForrest France
early as poss // use permit to occupy the 7th floor // Jim Phone #: ###-#### *Completed on site walkthrough with G. Goldsmith, T. Gainor, and general contractors. Project is not in condition for occupancy at this time due to construction underway and site work in progress.*
BLD-Other11/27/201312/2/201312/4/2013APART
DetailsDave Hannah
Mid-morning request // apt fire caulking cover, 7th floor ceiling insp // Jim Phone #: ###-#### ok to 7th floor ceiling and 4th floor walls
BLD-Ceiling Grid Inspection11/20/201311/21/201311/22/2013APART
DetailsDave Hannah
After 10 please - 2nd fl apartments - Jim Phone #: ###-#### ok to cover ceilings 2nd and 3rd fl apts and rest rooms on 6th fl
BLD-Framing/Rough-in11/18/201311/19/201311/19/2013AFAIL
DetailsDave Hannah
cover for 6th flr bathrooms // Jim Phone #: ###-#### need to fire stop at ceiling and floor lines
BLD-Other11/14/201311/15/201311/18/2013PPART
DetailsDave Hannah
late am // fire caulking 4th floor apts // Jim Phone #: ###-#### ok to cover walls
BLD-Framing/Rough-in11/7/201311/8/201311/12/2013APART
DetailsDave Hannah
4th floor walls in the apts, 3rd floor ceiling cover, insulation on 2nd floor all in the apartments--Jim Phone #: ###-#### ok to cover 3rd floor ceiling but needs to finish fire stopping on 4th floor.
BLD-Other11/1/201311/4/201311/5/2013APART
DetailsDave Hannah
Mock up cover - Jim Phone #: ###-#### needs to fire proof floor and ceiling opennings ok to one side
BLD-Framing/Rough-in11/4/201311/4/201311/5/2013PPEND
DetailsDave Hannah
fire proofing floor in chase by elev shaft west wing
BLD-Ceiling Grid Inspection10/31/201311/1/201311/1/2013APASS
DetailsDave Hannah
3rd floor apts // Jim Phone #: ###-####
BLD-Other10/30/201310/31/201310/31/2013APASS
DetailsDave Hannah
4th fl ceiling cover/apartments - Jim Phone #: ###-####
BLD-Framing/Rough-in10/25/201310/29/201310/29/2013APART
DetailsDave Hannah
jim Phone #: ###-#### 7th floor ok to cover walls
BLD-Framing/Rough-in10/23/201310/24/201310/24/2013APART
DetailsDave Hannah
7th fl core, 3rd & 4th apartment- Jim Phone #: ###-#### ok to cover ext walls ok to one side ent walls
BLD-Conference10/15/201310/16/201310/16/2013ADONE
DetailsDave Hannah
jim - before 10 please Phone #: ###-####
BLD-Other10/11/201310/14/201310/15/2013APART
DetailsDave Hannah
fire pillow insp, 3rd flr apts // jim Phone #: ###-#### ok to cover
BLD-Ceiling Grid Inspection10/7/201310/8/201310/9/2013APART
DetailsDave Hannah
2nd floor corrider ceiling insp // Jim Phone #: ###-#### ok to insulate and rock
BLD-Framing/Rough-in10/2/201310/3/201310/4/2013ANR
DetailsDave Hannah
request late AM -- conference/cover insp/framing -- Jim Phone #: ###-####
BLD-Conference9/26/20139/27/20139/27/2013ADONE
DetailsDave Hannah
bradden Phone #: ###-####
BLD-Conference9/17/20139/18/20139/18/2013PDONE
DetailsDave Hannah
1:00 pm meeting to walk project .
BLD-Concrete9/13/20139/16/20139/17/2013APEND
DetailsDave Hannah
JIM Phone #: ###-####
BLD-Conference9/10/20139/11/20139/12/2013ADONE
DetailsDave Hannah
jim Phone #: ###-####