Permit Information
Permit NumberBLD13-00943
StatusFinaled
Name HC COMPANY INC
Site Address 12650 W BRIDGER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Brighton HC Building (Shell Only) - To construct a new 16,475 square foot, one story, shell building and related site improvements. This building is for future office and warehouse tenant spaces. This building will be constructed of concrete tilt-up exterior walls with steel joist and girder roof system. This building will be fully fire sprinkled. This is shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/22/201311/22/201311/22/2013PPASS
DetailsJim Sly
DOC - Permit Finaled11/22/201311/22/201311/22/2013PPASS
DetailsJim Sly
BLD-Final11/21/201311/22/201311/22/2013APEND
DetailsJim Sly
BLD-Final11/21/201311/21/201311/21/2013PNR
DetailsJim Sly
darren Phone #: ###-####
FIRE-Final Inspection11/20/201311/21/201311/21/2013PPART
DetailsTroy Cobbley
A temporary occupancy for life safety is ok per Romeo Gervais until the CM Company tenant space is complete. 12-10-13 per phone call with Troy Cobbley fire has been signed off all the way.the building final was signed off early,but Troy went back out and signed it off.
FIRE-Final Inspection11/19/201311/20/201311/20/2013ACANC
DetailsTroy Cobbley
Not ready for life safety due to emergency lights.
FIRE-Final Inspection11/18/201311/19/201311/19/2013ACANC
DetailsTroy Cobbley
Not ready for inspection. Rescheduled for tomorrow
BLD-Energy code compliance10/21/201310/22/201310/22/2013APASS
DetailsJim Sly
Darren Phone #: ###-####
FIRE-Conference10/14/201310/15/201310/15/2013ADONE
DetailsTroy Cobbley
darren discussed sprinkler protection in the center space that may have a tenant soon
BLD-Framing/Rough-in10/14/201310/14/201310/14/2013PPASS
DetailsJim Sly
darren Phone #: ###-####
BLD-Energy code compliance9/10/20139/11/20139/11/2013APART
DetailsJim Sly
Darren-Please call at least 30 mins prior to inspection Phone #: ###-####
2 Layers 2 1/2 " roof insulation OK.
BLD-Footing8/14/20138/15/20138/15/2013APASS
DetailsJim Sly
darren Phone #: ###-####
Trash Enclosure.
BLD-Footing8/13/20138/14/20138/14/2013PCANC
DetailsJim Sly
darren Phone #: ###-####
BLD-Footing8/9/20138/12/20138/12/2013APASS
DetailsJim Sly
Darren please call 30 min before going out Phone #: ###-####
Footing OK pending MTI special insp, tests and approvals
BLD-Footing8/8/20138/9/20138/9/2013PNR
DetailsJim Storey
rebar - Darren Phone #: ###-####
BLD-Other8/5/20138/6/20138/6/2013PPART
DetailsJim Sly
call 1/2 hr before//rebar//darren Phone #: ###-####
Remainder of tilt up panels OK pending MTI special inspections, tests and approvals.
BLD-Other7/29/20137/30/20137/30/2013APART
DetailsJim Sly
call 1/2 hr ahead//rebar // darren Phone #: ###-####
Panels 18, 19, 20, 21, 23 ,24 ,25, 26 ,27, 7 ,8 ,9, 10, 11, 12, 13, 14, 15, 16, and 17. Pending MTI special inspection, tests and approvals. Panels pending MTI inspection include.....1, 2, 3, 4, 5, 6, and trash enclosure panels.
Approved plans on site.
FIRE-Conference7/11/20137/12/20137/12/2013ADONE
DetailsTroy Cobbley
Daren, Don and I discussed options to get the fire sprinkler supply piping down to the proper depth of cover once it leaves the United Water stub out.