Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-00996
StatusIssued
Name ESI
Site Address 300 N MILWAUKEE ST
Project NameJCPenney - Home Dept
Customer Number 
ePlanReviewNo
Description
(JCPENNEY – Home Dept. Remodel – BTS) This building is fire sprinklered for area increase. Permit is to remodel the entire Home Dept. in an existing JCPenny retail anchor store. PLAN MODIFICATION 8-5-13 – Modification submitted to make minor modification to existing restrooms to upgrade restrooms to be fully accessible. These modifications do not result in any increase or decrease in the number of fixtures currently provided. **TLW** Work is to include: construction of a new non-combustible full height partition walls to isolate different areas in the Home Dept (such as: furniture, bed and bath, kitchen, etc), relocate multiple light fixtures, replacing less than 50% of existing lighting with new LED lights, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/201310/17/201310/17/2013PNR
DetailsMike Jordan
Please contact me 30 minutes prior. While in route. I will meet you there. Thanks Phone #: ###-#### >> Inspection requested via web by Matt Perry. Needs firsprinkler and life/safety finals.
FIRE-Conference6/10/20136/10/20136/10/2013PDONE
DetailsTroy Cobbley
The project superintendant and I discussed general life safety requirements. We also discussed problems with the sprinkler coverage at the new soffits and possible fire alarm modifications being needed due to new wall arrangements.
BLD-Framing/Rough-in5/23/20135/23/20135/23/2013PPART
DetailsMike Jordan
bob Phone #: ###-####. iNterior steel stud framed wall. Needs to submit plan mod, wall has been relocated.
BLD-Ceiling Grid Inspection5/21/20135/22/20135/22/2013APASS
DetailsMike Jordan
BOB Phone #: ###-####
BLD-Framing/Rough-in5/1/20135/2/20135/2/2013PPART
DetailsMike Jordan
Bob Phone #: ###-####. interior steel stud walls ok. pending electrical rough in inspection at areas not yet inspected.