BLD-Final | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PASS |
Jim Storey
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PART |
Jim Storey
|
|
|
Brad Phone #: ###-#### fire ok no sig.
|
FIRE-Final Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/5/2013 | 11/7/2013 | 11/7/2013 | P | PART |
Forrest France
|
|
|
Final pending fire sprinkler system modifications due to rack storage array.
|
FIRE-Final Inspection | 5/23/2013 | 5/23/2013 | 5/23/2013 | A | PART |
Forrest France
|
|
|
Final pending defined exit path per plan review annotations, racking permit.
|
FIRE-Final Inspection | 5/8/2013 | 5/15/2013 | 5/15/2013 | P | FAIL |
Forrest France
|
|
|
Refer to permit documents general requirements page items number 8 and 9 for items needed prior to final. Repair one EM light above the preaction fire alarm panel.
|