Permit Information
Permit NumberBLD13-01113
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 276 N 8TH ST
Project NameIDAHO BLDG - 1ST FLR
Customer Number 
ePlanReviewNo
Description
(YOKOZUNA TERIYAKI RESTAURANT - IDAHO BLDG - 1ST FLR) To remodel a 1,588 sq.ft. existing restaurant created under BLD10-01904 (BAGUETTE DELI - IDAHO BLDG - 1ST FLR) for a new restaurant. Work includes demo of interior non-bearing walls, in fill of 2 doors not part of exit system as shown on the approved plans. Attached approval from ACHD, attached plan review comments, attached mechanial revision, attached plumbing fixture calculaiton, attached calculations for non protected openings in rated wall and all plan review conditions attached to plans by all reviewing agencies. Scope of work includes: installation of new kitchen equipment, installation of a new type I hood, (Big Dipper) grease trap under sink to remain, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully sprinklered per 1994 UCBC because it is too tall and has too many stories. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/11/20139/11/20139/11/2013PPASS
DetailsDave Hannah
jack Phone #: ###-####
BLD-Final8/9/20138/12/20138/12/2013PPART
DetailsDave Hannah
call 30 min before // Jack Phone #: ###-#### ok for temp occ ok for perm occ after mec gos perm
FIRE-Final Inspection8/9/20138/12/20138/12/2013APASS
DetailsForrest France
Fire life safety inspection completed acceptable.
FIRE-Sprinkler Rough-in6/24/20136/24/20136/24/2013APART
DetailsForrest France
Okay to cover fire sprinkler modifications at the grid ceilings.
BLD-Framing/Rough-in6/14/20136/17/20136/17/2013APART
DetailsDave Hannah
Ceiling grid Please contact John if you have questions Phone #: ###-#### ok to cover
FIRE-Conference6/12/20136/12/20136/12/2013ADONE
DetailsForrest France
Regarding hood suppression work and fire life safety inspection items.