BLD-Final | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Mike Jordan
|
|
|
Fire wall - Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Energy code compliance | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | FAIL |
Jim Storey
|
|
|
Mike Phone #: ###-#### c/n not done
|
BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | FAIL |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. Complete the draft stop between unitsat roof valley, provide hangars on B2B trusses. Ok to insulate. Also noted that will need to see 5/8 type x sheet rock attachment and continuity for 1hr. wall between units.
|
BLD-Framing/Rough-in | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | NR |
Mike Jordan
|
|
|
mike Phone #: ###-####. Complete airseal package correction notice posted.
|
BLD-Wall Bracing | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
BLD-Footing | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PASS |
Mike Jordan
|
|
|
Interior footings ok.
|
BLD-Foundation | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PASS |
Mike Jordan
|
|
|
found wall//Jared Phone #: ###-####
|
BLD-Footing | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PASS |
Mike Jordan
|
|
|
Jared Draper Phone #: ###-####
|