Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-01133
StatusFinaled
Name JH DEVELOPMENT INC
Site Address 2920 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 3448 sq. ft., two story ( basement 1553 sq. ft.), (first floor 1895 sq. ft.) single family dwelling with 5 bedrooms, and (2) ½ baths, approximately 399 sq. ft. of covered patio/porch and a 908 sq. ft. attached garage per the approved plans, res check, brandguard vent specification, guardrail detial, engineering, revised engineering, plan review report and any notations. R- 1A/DA zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/14/20148/14/20148/14/2014PPASS
DetailsPhil Shearer
Eric Phone #: ###-####
DOC - Permit Finaled8/14/20148/14/20148/14/2014PPASS
DetailsPhil Shearer
BLD-Final6/25/20146/25/20146/25/2014PFAIL
DetailsDave Hannah
Eric Phone #: ###-#### c/n on site
BLD-Energy code compliance10/4/201310/7/201310/7/2013APASS
DetailsDave Hannah
eric Phone #: ###-####
BLD-Framing/Rough-in10/2/201310/2/201310/2/2013PPART
DetailsJim Storey
eric Phone #: ###-#### sheer ok/ truss bracing as noted/ nail cluster on 3 ply/ floor joist cut topchord by plm water closet. ok to insulate// soffit nr.
BLD-Foundation7/25/20137/26/20137/26/2013APASS
DetailsDave Hannah
ben Phone #: ###-####
BLD-Footing7/16/20137/16/20137/16/2013PPART
DetailsJim Sly
ben Phone #: ###-####
Footing at North East corner area (at over dig) OK.
BLD-Footing7/15/20137/16/20137/16/2013ACANC
DetailsJim Sly
request inspection after 10 am Phone #: ###-#### >> Inspection requested via web by Ben Sears
RE-sched for PM.
BLD-Footing7/5/20137/5/20137/8/2013PPART
DetailsDave Hannah
BEN Phone #: ###-#### ok to pour ext wall ftgs