(UNION SQUARE APTS)(BLDG#14) To construct a wood frame, three story, 28,041 sq. ft., 24 Unit Multi Family Dwellings - 1 (1B/1B Type 'A'), 4 (2B/2B Type 'B'), 3 (1B/1B Type 'B'), 8 (2B/2B), and 8 (1B/1B), per reviewed plans. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20146/6/20146/5/2014APASS
DetailsMike Jordan
BLD-Final1/24/20141/27/20141/27/2014APART
DetailsMike Jordan
Temp occ. granted. Wil be ok for eprm occ. once zoning and public works signs perm.
BLD-Ceiling Grid Inspection1/23/20141/24/20141/24/2014PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Rescheduled for monday 1-27 in the AM.
FIRE-Final Inspection1/22/20141/23/20141/23/2014APASS
DetailsTroy Cobbley
Life safety passed. Self closing doors not set up yet. Building inspector please verify.
BLD-Conference1/8/20141/8/20141/8/2014ADONE
DetailsMike Jordan
BLD-Wall cover10/15/201310/16/201310/16/2013APASS
DetailsMike Jordan
Center units, three on second floor, four on first floor. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. All units ok for cover. Interior shear walls, party walls and firestop is completed.
BLD-Wall cover10/14/201310/15/201310/15/2013APASS
DetailsMike Jordan
BLD-Wall cover10/14/201310/14/201310/14/2013PCANC
DetailsMike Jordan
BLD-Wall Bracing10/11/201310/14/201310/14/2013ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall cover10/11/201310/11/201310/11/2013ANR
DetailsMike Jordan
BLD-Wall cover10/11/201310/11/201310/11/2013PPART
DetailsMike Jordan
1st. floor east units ok. Middle units 2nd floor ok, for face layers on floor ceiling assemblies and 1st. floor middle units.
BLD-Wall cover10/9/201310/9/201310/9/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor east unit, interior shear, partywalls and firestop ok.
BLD-Wall cover10/7/201310/8/201310/8/2013PPASS
DetailsMike Jordan
1st. floor west units partywall, interior walls and firestopping ok.
BLD-Wall cover10/8/201310/8/201310/8/2013ANR
DetailsMike Jordan
BLD-Wall Bracing10/7/201310/7/201310/7/2013PPASS
DetailsMike Jordan
Interior shear walls, party walls and firestop ok at 3drfloor east and west units, 2nd floor east and west units are ok to tape and finish. Base layer on floor/ceiling assembly ok at 1st. floor east and west units.
BLD-Wall cover10/3/201310/4/201310/4/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3RD. FLOOR interior shear, partwalls and firestop ok. Ok to tape 3rd. floor enits at east a middle section of building.
BLD-Wall cover10/4/201310/4/201310/4/2013ANR
DetailsMike Jordan
BLD-Wall cover10/3/201310/3/201310/3/2013PPART
DetailsMike Jordan
3rd floor east units ok at party walls. Needs to firestop plumbing and electrical.
BLD-Wall Bracing10/2/201310/2/201310/2/2013PPART
DetailsMike Jordan
2nd floor base layer for floor ceiling assembly, west units only.
BLD-Wall Bracing10/2/201310/2/201310/2/2013ANR
DetailsMike Jordan
BLD-Wall Bracing10/1/201310/1/201310/1/2013PPART
DetailsMike Jordan
2nd floor lid, base layer ok, west units only.
BLD-Wall cover9/30/201310/1/201310/1/2013APART
DetailsMike Jordan
Sheet rock nailing on third floor walk. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall cover9/26/20139/27/20139/27/2013ACANC
DetailsMike Jordan
Insulation / Cover Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance9/27/20139/27/20139/27/2013APASS
DetailsMike Jordan
1st, 2nd and 3rd floors ok for sheet rock.
FIRE-Sprinkler Rough-in9/24/20139/24/20139/25/2013PPASS
DetailsTroy Cobbley
Tenting has been corrected. Sprinkler piping can be covered.
BLD-Energy code compliance9/25/20139/25/20139/25/2013PPART
DetailsMike Jordan
Airseal pack ok on 3rd floor and exterior walls.
BLD-Framing/Rough-in9/25/20139/25/20139/25/2013PPASS
DetailsMike Jordan
Framing for 1st, 2nd and 3rd floors ok.
BLD-Energy code compliance9/25/20139/25/20139/25/2013ACANC
DetailsMike Jordan
air sill, late AM. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Moved to pm.
BLD-Framing/Rough-in9/24/20139/24/20139/24/2013PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance9/24/20139/24/20139/24/2013PNR
DetailsMike Jordan
Air seal Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in9/23/20139/24/20139/24/2013APART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor framing and firestopping. Work in progress on framing repairs. 3rd floor firestopping ok. Needs to complete airseal package and provide truss engineering prior to cover.
BLD-Framing/Rough-in9/23/20139/23/20139/23/2013PPART
DetailsMike Jordan
Fire Caulk / framing / rough in Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor framing, fire stopping and blocking. Still missing fire cauliking on electrical wires and some plumbing.
BLD-Conference9/19/20139/19/20139/19/2013PPART
DetailsMike Jordan
Walk fire caulk application Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st floor plumbing penetrations. 80 % completed.
BLD-Conference9/11/20139/11/20139/13/2013PCANC
DetailsJim Sly
BLD-Conference9/10/20139/10/20139/12/2013PCANC
DetailsJim Sly
BLD-Wall Bracing8/28/20138/28/20138/28/2013APASS
DetailsMike Jordan
East end third floor building 14 sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. East and west end, 3rd. floor shear nailing, exterior walls ok.
BLD-Conference8/27/20138/27/20138/27/2013PDONE
DetailsMike Jordan
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall Bracing8/27/20138/27/20138/27/2013PPART
DetailsMike Jordan
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3rd floor, north and south sides only.
BLD-Conference8/23/20138/23/20138/23/2013APASS
DetailsMike Jordan
Pre rock on gable ends at corridors.
BLD-Wall Bracing8/14/20138/14/20138/14/2013PPASS
DetailsMike Jordan
first two floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Interior holdowns ok. Exterior shearwalls, 1st and 2nd. floors ok to cover.
BLD-Wall Bracing8/12/20138/12/20138/12/2013PNR
DetailsMike Jordan
first and second floors
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still needs to install floor to floor straps and tighten down interior hold downs.
BLD-Wall Bracing8/6/20138/6/20138/6/2013ANR
DetailsMike Jordan
BLD-Wall Bracing8/5/20138/5/20138/5/2013PNR
DetailsMike Jordan
First two floors wall bracing and hold downs. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still missing some areas on 1st and 2nd floor, needs to install floor to floor straps and complete install of holdowns.
BLD-Wall Bracing8/2/20138/2/20138/2/2013PNR
DetailsMike Jordan
BLD-Wall Bracing7/31/20137/31/20137/31/2013PPART
DetailsMike Jordan
1st. floor, exterior walls only.
BLD-Framing/Rough-in7/30/20137/30/20137/30/2013PPART
DetailsMike Jordan
Partial inspection on shearwalls, 2nd. floor, west end.
BLD-Conference7/24/20137/25/20137/25/2013PPART
DetailsMike Jordan
Walk through for framing inspection. Recieved the 1hr. floor ceiling assembly for the roseburg RFPI joist being used on the project. Will have scanned in. Will be using joist on all buildings.
BLD-Conference7/24/20137/24/20137/24/2013PPART
DetailsMike Jordan
Framing review Phone #: ###-#### >> Inspection requested via web by Mike McHargue. PArtial walk through on 1st floor framing in progress.