BLD-Final | 6/5/2014 | 6/6/2014 | 6/5/2014 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | PART |
Mike Jordan
|
|
|
Temp occ. granted. Wil be ok for eprm occ. once zoning and public works signs perm.
|
BLD-Ceiling Grid Inspection | 1/23/2014 | 1/24/2014 | 1/24/2014 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Rescheduled for monday 1-27 in the AM.
|
FIRE-Final Inspection | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Self closing doors not set up yet. Building inspector please verify.
|
BLD-Conference | 1/8/2014 | 1/8/2014 | 1/8/2014 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | PASS |
Mike Jordan
|
|
|
Center units, three on second floor, four on first floor. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. All units ok for cover. Interior shear walls, party walls and firestop is completed.
|
BLD-Wall cover | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/14/2013 | 10/14/2013 | 10/14/2013 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | PART |
Mike Jordan
|
|
|
1st. floor east units ok. Middle units 2nd floor ok, for face layers on floor ceiling assemblies and 1st. floor middle units.
|
BLD-Wall cover | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor east unit, interior shear, partywalls and firestop ok.
|
BLD-Wall cover | 10/7/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Mike Jordan
|
|
|
1st. floor west units partywall, interior walls and firestopping ok.
|
BLD-Wall cover | 10/8/2013 | 10/8/2013 | 10/8/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Mike Jordan
|
|
|
Interior shear walls, party walls and firestop ok at 3drfloor east and west units, 2nd floor east and west units are ok to tape and finish. Base layer on floor/ceiling assembly ok at 1st. floor east and west units.
|
BLD-Wall cover | 10/3/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3RD. FLOOR interior shear, partwalls and firestop ok. Ok to tape 3rd. floor enits at east a middle section of building.
|
BLD-Wall cover | 10/4/2013 | 10/4/2013 | 10/4/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall cover | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PART |
Mike Jordan
|
|
|
3rd floor east units ok at party walls. Needs to firestop plumbing and electrical.
|
BLD-Wall Bracing | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PART |
Mike Jordan
|
|
|
2nd floor base layer for floor ceiling assembly, west units only.
|
BLD-Wall Bracing | 10/2/2013 | 10/2/2013 | 10/2/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | PART |
Mike Jordan
|
|
|
2nd floor lid, base layer ok, west units only.
|
BLD-Wall cover | 9/30/2013 | 10/1/2013 | 10/1/2013 | A | PART |
Mike Jordan
|
|
|
Sheet rock nailing on third floor walk. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall cover | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | CANC |
Mike Jordan
|
|
|
Insulation / Cover Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 9/27/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Mike Jordan
|
|
|
1st, 2nd and 3rd floors ok for sheet rock.
|
FIRE-Sprinkler Rough-in | 9/24/2013 | 9/24/2013 | 9/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Tenting has been corrected. Sprinkler piping can be covered.
|
BLD-Energy code compliance | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PART |
Mike Jordan
|
|
|
Airseal pack ok on 3rd floor and exterior walls.
|
BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Mike Jordan
|
|
|
Framing for 1st, 2nd and 3rd floors ok.
|
BLD-Energy code compliance | 9/25/2013 | 9/25/2013 | 9/25/2013 | A | CANC |
Mike Jordan
|
|
|
air sill, late AM. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Moved to pm.
|
BLD-Framing/Rough-in | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | NR |
Mike Jordan
|
|
|
Air seal Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Framing/Rough-in | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor framing and firestopping. Work in progress on framing repairs. 3rd floor firestopping ok. Needs to complete airseal package and provide truss engineering prior to cover.
|
BLD-Framing/Rough-in | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PART |
Mike Jordan
|
|
|
Fire Caulk / framing / rough in Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st. floor framing, fire stopping and blocking. Still missing fire cauliking on electrical wires and some plumbing.
|
BLD-Conference | 9/19/2013 | 9/19/2013 | 9/19/2013 | P | PART |
Mike Jordan
|
|
|
Walk fire caulk application Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st floor plumbing penetrations. 80 % completed.
|
BLD-Conference | 9/11/2013 | 9/11/2013 | 9/13/2013 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 9/10/2013 | 9/10/2013 | 9/12/2013 | P | CANC |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 8/28/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Mike Jordan
|
|
|
East end third floor building 14 sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. East and west end, 3rd. floor shear nailing, exterior walls ok.
|
BLD-Conference | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | DONE |
Mike Jordan
|
|
|
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | PART |
Mike Jordan
|
|
|
Building 14 third floor sheer. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3rd floor, north and south sides only.
|
BLD-Conference | 8/23/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Mike Jordan
|
|
|
Pre rock on gable ends at corridors.
|
BLD-Wall Bracing | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PASS |
Mike Jordan
|
|
|
first two floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Interior holdowns ok. Exterior shearwalls, 1st and 2nd. floors ok to cover.
|
BLD-Wall Bracing | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | NR |
Mike Jordan
|
|
|
first and second floors Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still needs to install floor to floor straps and tighten down interior hold downs.
|
BLD-Wall Bracing | 8/6/2013 | 8/6/2013 | 8/6/2013 | A | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | NR |
Mike Jordan
|
|
|
First two floors wall bracing and hold downs. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Still missing some areas on 1st and 2nd floor, needs to install floor to floor straps and complete install of holdowns.
|
BLD-Wall Bracing | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | NR |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PART |
Mike Jordan
|
|
|
1st. floor, exterior walls only.
|
BLD-Framing/Rough-in | 7/30/2013 | 7/30/2013 | 7/30/2013 | P | PART |
Mike Jordan
|
|
|
Partial inspection on shearwalls, 2nd. floor, west end.
|
BLD-Conference | 7/24/2013 | 7/25/2013 | 7/25/2013 | P | PART |
Mike Jordan
|
|
|
Walk through for framing inspection. Recieved the 1hr. floor ceiling assembly for the roseburg RFPI joist being used on the project. Will have scanned in. Will be using joist on all buildings.
|
BLD-Conference | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PART |
Mike Jordan
|
|
|
Framing review Phone #: ###-#### >> Inspection requested via web by Mike McHargue. PArtial walk through on 1st floor framing in progress.
|